encoding utf-8 survey sima56 -title "Sima 56
(Torca del Cueto de
Los Senderos)
Andara,Picos de Europa" centerline cs UTM30N station 78doline "Sima 56" entrance fix 78doline 0359775 4785485 1975 date 1978.07.14 team "L.U.S.S." # declination 0.0000 degrees units length meters units compass clino degrees data normal from to length compass clino #extend right #78doline 7814A 9.20 0.00 -90.00 #A 30.18 0.00 -90.00 0.00 0.00 0.00 0.00 A is the top of the boss at the entrance, used as a backup belay 78doline 7814A 1.20 0.00 -90.00 #correction for depth 7814A 7814B 3.58 121.00 -60.00 #I think there is a vertical drop of about 3 m from 7814B to the floor (MAS) 7814B 7814C 7.20 142.00 -67.00 #C 23.62 142.00 -67.00 0.00 0.00 0.00 0.00 C is the head of Tigger's Pitch 7814C 7814D 122.00 0.00 -90.00 #D 400.26 0.00 -90.00 0.00 0.00 0.00 0.00 D is the bottom of the pitch 7814D 7814E 3.80 28.00 -6.00 7814E 7814F 9.16 15.00 -3.00 7814F 7814G 3.10 35.00 2.00 7814G 7814H 3.51 318.00 18.00 7814H 7814I 2.47 261.00 27.00 7814I 7814J 4.23 275.00 25.00 7814J 7814K 2.18 320.00 -39.00 7814K 7814L 1.50 329.00 -27.00 7814L 7814M 5.23 72.00 12.00 7814M 7814N 3.97 303.00 -10.00 #Surveying from Fools Blend passage to bottom of P17 date 1978.07.26 7814N 7826O 1.40 83.00 0.00 7826O 7826P 5.60 331.00 -34.00 7826P 7826Q 5.90 294.00 -16.00 7826Q 7826R 6.20 298.00 -13.00 7826R 7826S 7.80 4.00 -14.00 7826S 7826S1 2.00 0.00 -90.00 7826S1 7826T 10.10 313.00 -37.00 7826T 7826U 12.60 341.00 -22.00 #Station U is the head of P47 7826U 7826V 16.00 0.00 -90.00 7826V 7826W 3.00 290.00 0.00 #I think this shot might be a pendulum to the rebelay. In subsequent years the rebelay was further down the 47 m pitch 7826W 7826X 30.50 0.00 -90.00 7826X 7826Y 2.00 290.00 0.00 7826Y 7826Z 17.00 0.00 -90.00 #This 17 m pitch is awkward and was bypassed a year or two later. But the bypass which follows the top of the next rift was never surveyed. 7826Y 7826aa 11.20 42.00 -17.00 7826aa 7826bb 9.70 172.00 -16.00 #At 7826 is an unclimbed 4 m climb up into an inlet #Surveying from the bottom of P17 to The top of The Abbatoir date 1978.07.26 7826Z 7826A1 1.30 181.00 0.00 #Station Z is the bottom of P17 7826A1 7826B1 3.00 217.00 10.00 #B1 9.84 217.00 10.00 0.00 0.00 0.00 0.00 B1 is the T-Junction Cafe 7826B1 7826C1 2.90 134.00 35.00 7826C1 7826D1 5.20 165.00 37.00 7826D1 7826E1 4.00 216.00 0.00 #This side passage ends at E1 with a pitch of approx 6m 7826B1 7826C2 1.20 284.00 0.00 #Now traversing the main passage 7826C2 7826D2 4.90 346.00 31.00 7826D2 7826E2 4.10 320.00 51.00 7826E2 7826F2 4.00 268.00 0.00 7826F2 7826G2 3.70 319.00 -24.00 7826G2 7826G3 6.00 0.00 -90.00 #G2 7826G3 19.69 0.00 -90.00 0.00 0.00 0.00 0.00 G2 is the top of Short Arse's Dilemma. The options were to either climb down to G3 or traverse over the top (as shown in the 1979 map), neither easy for a short person. At the bottom of the climb an unsurveyed passage goes a short way to a sump. 7826G3 7826H3 5.00 358.00 -9.00 7826H3 7826I3 2.60 48.00 0.00 7826I3 7826J3 5.50 268.00 -5.00 7826J3 7826K3 2.70 337.00 0.00 7826K3 7826L3 2.20 307.00 0.00 7826L3 7826M3 3.40 327.00 8.00 7826M3 7826M4 4.30 0.00 -90.00 #This climb down was common to both the 1978 and 1979 routes. 7826M4 7826N4 4.40 346.00 0.00 #Station N4 is the top of the pitch/climb into The Abbatoir #The survey was on, or before this date. In my notebook, the entries for this survey come after those for the 10th August and I did the final depth calculations on the 12th. date 1979.08.11 791101 791102 2.50 116.00 20.00 #Starting at the top of The Ramp, heading out 791102 791103 2.10 20.00 0.00 791103 791104 2.20 88.00 0.00 791104 791105 3.40 166.00 0.00 791105 791106 7.10 111.00 0.00 791106 791107 2.90 88.00 0.00 791107 791108 7.10 43.00 2.00 791108 791109 6.00 134.00 -28.00 791109 791110 5.20 151.00 -61.00 791110 791111 1.80 211.00 0.00 791111 791112 6.80 126.00 9.00 791112 791113 3.00 154.00 0.00 791113 791114 2.00 130.00 0.00 791114 791115 6.60 91.00 45.00 791115 791116 3.20 103.00 42.00 791116 791117 6.90 175.00 21.00 791117 791118 6.00 194.00 -23.00 791118 791119 14.10 0.00 90.00 #This shot is the 14 m pitch out of The Slasher 791119 791120 3.50 180.00 0.00 791120 791121 2.90 270.00 -15.00 791121 791122 2.50 232.00 47.00 791123 791122 5.70 24.00 0.00 791124 791123 2.90 272.00 0.00 791125 791124 3.30 220.00 0.00 791126 791125 2.30 325.00 -23.00 791127 791126 2.50 34.00 -26.00 791128 791127 2.50 350.00 0.00 791129 791128 3.40 114.00 4.00 791130 791129 4.40 349.00 0.00 791131 791130 2.00 349.00 0.00 791132 791131 3.00 48.00 0.00 791133 791132 2.50 360.00 0.00 791134 791133 2.90 268.00 0.00 791135 791134 5.00 348.00 0.00 791136 791135 3.10 237.00 0.00 791137 791136 2.10 250.00 0.00 791138 791137 4.60 132.00 24.00 791139 791138 3.00 276.00 0.00 791140 791139 5.50 291.00 -27.00 791141 791140 4.10 302.00 -15.00 791142 791141 7.40 290.00 0.00 791143 791142 4.70 360.00 0.00 791144 791143 1.00 65.00 0.00 791145 791144 3.30 20.00 0.00 791146 791145 2.50 322.00 0.00 791147 791146 2.30 234.00 0.00 791148 791147 2.00 315.00 0.00 791149 791148 1.80 239.00 0.00 791150 791149 5.90 346.00 0.00 791151 791150 2.00 295.00 0.00 791152 791151 2.10 314.00 0.00 791152 7826N4 4.00 0.00 90.00 #Surveying out from the bottom of the Pink Pitch to the top of The Ramp date 1979.07.31 793101 793102 23.30 360.00 90.00 #From the bottom to the top of the Pink Pitch (colour a result of dye tracing with Rhodamine placed in The Abbatoir) 793102 793103 2.40 315.00 -6.00 #Stations 2-6 is a traverse in a 2 m wide rift 793103 793104 3.10 274.00 1.00 793104 793105 4.40 14.00 -12.00 793105 793106 5.20 36.00 60.00 #Station 6 is directly above The Confluence 793106 793107 4.40 77.00 -5.00 #Station 7 is 2 m above the stream 793107 793108 1.30 47.00 29.00 793108 793109 2.00 130.00 24.00 #7-9 is a 2 m climb 793109 793110 1.81 89.00 -4.00 #Average width past the climb up is 70 cm 793110 793111 1.30 32.00 -20.00 793111 793112 1.00 76.00 14.00 #Station 12 is 2 m above the stream 793112 793113 4.00 21.00 39.00 #12-13 small cascades 793113 793114 3.80 101.00 -16.00 #Station 14 is a point on the rope 50 cm above the floor 793114 793115 4.30 360.00 90.00 #This part of the 31 m pitch is out of the narrow rift to the floor of a chamber 793115 793116 27.00 360.00 90.00 #From the top the first 27 m of P31 is to the floor of the chamber and then continues down a slot in the floor 793116 793117 2.80 152.00 42.00 #Station 16 is the head of P31 (which is closer to 32 m). Shale beds at 16 dip north at approx 70 degrees. This shot crosses the rift from one wall to another 793117 793117a 4.70 103.00 8.00 793117a 793118 3.10 124.00 -10.00 #Stations 16-18 is in a 2 m wide rift 793118 793119 7.70 75.00 28.00 #Station 19 is a rock on the floor in the middle of a 12 m wide chamber. The estimated height of the roof here was 25 m 793119 793120 13.30 101.00 -12.00 793120 793121 2.70 130.00 -4.00 793121 793122 4.80 153.00 25.00 #Shale beds here dip 70 degrees northwards 793122 793123 11.90 142.00 7.00 #Between 22 and 23 is an unexplored 2.5 m wide lead to the south, possibly just an oxbow 793123 793124 2.80 92.00 -2.00 #24 9.19 92.00 -2.00 0.00 0.00 0.00 0.00 24 is 1.5 m above the floor 793124 793125 6.90 137.00 9.00 #25 22.64 137.00 9.00 0.00 0.00 0.00 0.00 25 is 1.7 m above the floor. It is the start of a 4 m climb up 793125 793126 5.10 195.00 69.00 #4.5 m climb up 793126 793127 2.70 209.00 21.00 #traversing 793127 793128 6.10 155.00 -3.00 #traversing. At 28 is an unexplored 3 m wide lead to the south, possibly the other end of an oxbow 793128 793129 2.30 232.00 23.00 #128 793129 7.55 232.00 23.00 0.00 0.00 0.00 0.00 1 m wide passage 793129 793130 2.80 265.00 18.00 #129 793130 9.19 265.00 18.00 0.00 0.00 0.00 0.00 1 m wide passage 793130 793131 1.10 228.00 -31.00 793131 793132 1.70 201.00 -6.00 793132 793133 6.30 119.00 -10.00 793133 793134 2.00 102.00 -5.00 793134 793135 3.90 87.00 4.00 #From station 26 to 35 is all traversing above the rift floor 793135 793136 5.70 142.00 41.00 793136 793137 7.50 153.00 -44.00 #Station 37 is the base of the ramp which can be climbed inside the rift just SE of stations 36/37 793137 791101 12.40 180.00 80.00 #791101 40.68 180.00 80.00 0.00 0.00 0.00 0.00 791101 is the top of the ramp #surveying from the bolt at the top of the Pink Pitch to the terminal sump below P118 date 1979.08.10 793102 791002 2.20 331.00 45.00 791002 791003 7.70 226.00 42.00 791003 791004 5.40 217.00 -33.00 #Station 4 is the top bolt of P118. Stations 3 and 4 are on the NW wall 791004 791005 117.90 360.00 -90.00 #This is P118 791005 791006 6.20 5.00 -26.00 #A few meters north of station 6 is a connection to a parallel shaft with pink water cascading down in 1979. This is the continuation of the Pink Pitch/Far Canal 791006 791007 24.20 360.00 -90.00 #Station 6 is on the far wall and 1 m above the lip of the pitch 791007 791008 4.90 76.00 -13.00 #Station 8 is 50 cm above the floor 791008 791009 4.60 114.00 -14.00 791009 791010 2.50 185.00 22.00 #Station 10 is 2 m above a hole down into a chamber (MAS comment, I think this might be the streamway route). Width of the passage along this shot is 1 m, height approx 5 m tapering 791010 791011 6.50 226.00 4.00 #Station 11 is on the north corner of a T junction and is 2 m above the floor. 791011 791012 4.20 201.00 8.00 #Station 12 is on the SW wall, 2 m above the floor 791012 791013 5.80 99.00 -13.00 #Station 13 is on a corner of a 1 m wide passage 791013 791014 5.60 5.00 -58.00 #Station 14 is the edge of a ladder pitch 791014 791015 9.20 360.00 -80.00 #91014 791015 30.18 360.00 -80.00 0.00 0.00 0.00 0.00 9 m laddered pitch 791015 791016 14.00 301.00 -41.00 #Cascades. Cross section approx 2x2 m square. Station 16 1 m above floor 791016 791017 10.20 297.00 -44.00 #Cascades. Station 17 is 1 m above a 2 m climb 791017 791018 4.40 342.00 -62.00 #Cascades. This is the 2 m climb 791018 791019 6.20 13.00 1.00 #Cascades. Station 19 is 50 cm above the floor. 19 is in a hading rift 2 m wide at the bottom 791019 791020 5.00 2.00 -13.00 #Station 20 is 50 cm above the floor and close to the edge of the sump which is at least 1.5 m deep. So can add 2 m to depth #Surveying in from the top of P31. date 1980.07.28 793116 802802 5.50 160.00 42.00 #Station 2 is on the floor with a rift below. 4 m wide at 2 802802 802803 2.80 5.00 0.00 #2802 802803 9.19 5.00 0.00 0.00 0.00 0.00 0.00 2 m wide at 3 802803 802804 5.80 305.50 -7.00 802804 802805 14.20 18.00 0.00 802805 802806 6.90 331.00 4.00 802806 802807 8.20 351.00 -5.00 #Junction X is between stations 6 and 7 802807 802808 12.40 360.00 0.00 #Station 8 is the start of The Maze 802808 802809 4.70 84.50 19.00 802809 802810 5.50 148.00 -16.00 #Survey date is based on my diary but the relevant entry says that they 'might' have done some surveying. But it might be a continuation of the 28th July survey date 1980.07.30 803002 803001 9.10 256.00 -18.00 #Station 1 is the bolt at the top of P8 just beyond the 1982 bivvy site 803002 803003 10.30 143.00 -14.00 803003 803004 17.25 39.00 0.00 803004 803005 1.73 34.00 65.00 #Going up the Humbug 803005 803006 1.33 40.00 40.00 #Going up the Humbug 803006 803007 13.00 84.00 -42.00 #From the Humbug back to the floor 803007 803008 18.40 104.00 54.50 #803007 803008 60.37 104.00 54.50 0.00 0.00 0.00 0.00 8 is the bolt for the 15 m pitch into Humbug Hall 803008 803009 8.30 92.00 54.50 #9 27.23 92.00 54.50 0.00 0.00 0.00 0.00 9 is the bolt for the top of P8 803009 803010 9.90 116.00 14.50 803010 803011 3.20 71.00 -11.00 803011 803012 25.15 111.00 0.00 803012 803013 7.65 91.00 -11.00 #I think station 13 is where I drew the far side of the Maze 803013 803014 3.70 15.00 43.50 803014 803015 7.40 36.00 -6.00 803015 803016 4.90 111.00 0.00 803016 803017 10.00 174.00 14.00 803017 803018 5.70 110.00 3.00 803018 803019 6.50 180.00 -11.00 803019 803020 9.85 67.00 10.00 803020 803021 2.50 81.00 -24.00 803021 803022 4.90 172.00 27.50 803022 803023 2.75 116.00 -18.00 803023 803024 0.90 135.00 -19.00 803024 802808 3.40 137.00 -9.00 #Starting from the limit of exploration that was below P8 and heading out to the top of P8 date 1980.08.02 800201 800202 7.60 293.00 0.00 #Station 1 is a black spot on top of a rock marked by an arrow above an undescended pitch (presumably the same shaft as the one below P8) 800202 800203 19.00 307.00 -1.00 #Station 3 id 1 m above boulders on the floor 800203 800204 9.25 290.00 -35.00 #Station 4 is above an undescended 1x5 m hole in the floor 800204 800205 5.95 282.00 -3.00 800205 800206 15.65 322.00 20.00 #Station 6 is a point on the rope for P19, 1 m above the floor. 5-6 goes up a boulder slope 800207 800208 6.30 165.00 -8.00 #Now surveying from the westernmost point that was the lead for 1982. 7 is near the top of a boulder pile and is marked with a 7 and X. P24 is immediately beyond 800208 800209 15.50 110.00 -32.00 #This shot is down a boulder slope and across the floor. There is an undescended pitch near 9 that drops into the lower passage underneath 800209 800210 4.40 239.00 -25.00 800210 800211 3.30 360.00 -90.00 #10-11 is a climb 800211 800212 4.05 285.00 -31.00 800212 800213 4.20 299.00 -29.00 800213 800214 6.20 290.00 17.00 #Station 14 is at the start of a traverse/climb down, descending approx 20 m and never explored to the end 800211 800215 2.30 138.00 0.00 800215 800216 2.95 360.00 -90.00 800216 800217 1.65 105.00 -50.00 800217 800218 10.10 8.00 -21.00 #From 16 to 18 there is no obvious floor or roof. 18 is level with the bottom of a climb 800218 800219 3.30 305.00 -40.00 800219 800220 5.40 69.00 14.00 #Station 20 is 1.5 m above a rocky floor 800220 800221 7.00 154.00 -16.00 800221 800222 10.15 40.00 18.00 800222 800206 3.80 332.00 20.00 800206 800223 18.60 360.00 90.00 #This is P19 (actually 19.6 m) 800223 800224 6.50 126.00 35.00 800224 800225 3.80 263.00 38.00 #Station 25 is at the top of P7 800225 800226 10.20 211.00 -5.00 #Beyond 26 is a hole in the floor down to the chamber below (I think this is Death Wish Pitch, measured in 1982 as P15) and an unexplored continuation beyond 800225 800227 18.00 117.00 14.00 800227 800228 5.60 137.00 3.00 800228 800229 12.10 121.00 -2.00 800229 800230 10.80 135.00 -4.00 800230 800231 1.00 225.00 0.00 800231 800232 5.00 360.00 -90.00 800232 800233 4.90 155.00 -15.00 800233 800234 5.80 104.00 15.00 #34 19.03 104.00 15.00 0.00 0.00 0.00 0.00 34 is the top of the Flake Climb (4 m climb) 800234 800235 7.20 154.00 -55.00 800235 800236 3.60 146.00 -23.00 800236 803001 7.80 360.00 90.00 #This is P8, which is actually the first part of a much longer drop, estimated at 65 m. #Surveying between the 1980 terminus above P24 and a point between P16 and P13. Heading out of the cave. date 1982.07.24 822401 822402 7.32 214.00 16.00 822402 822403 6.47 241.00 47.00 822403 822404 1.49 189.00 5.00 822404 822405 5.25 203.00 42.00 822405 822406 2.48 252.00 0.00 822406 822407 2.87 155.00 16.00 822407 822408 3.21 120.00 -5.00 822408 822409 3.53 84.00 0.00 822409 822410 7.02 191.00 6.00 822410 822411 12.73 360.00 90.00 822411 822412 3.37 360.00 90.00 #Shots10-12 are P16 822412 822413 6.51 191.00 11.00 822413 822414 6.60 153.00 6.00 822414 822415 11.14 360.00 90.00 #This is P11 822415 822416 11.93 144.00 26.00 822416 822417 3.35 360.00 90.00 822417 822418 8.52 360.00 90.00 #Shots 16-18 are P12 822418 822419 4.67 50.00 55.00 #Station 19 is the top of P3. 822419 822420 3.68 129.00 19.00 822420 822421 9.59 170.00 38.00 822421 822422 4.75 187.00 45.00 822422 822423a 3.93 175.00 39.00 822423a 822423 9.72 165.00 32.00 822423 822424 8.96 136.00 -16.00 822424 822425 17.30 360.00 90.00 822425 822426 5.63 360.00 90.00 #Shots 224-26 are P24 822426 800207 4.66 210.00 22.00 #Connecting to 1980 terminus #Surveying from the top of the Cascades Pitch (P19) to the start of the 56_8201 survey date 1982.08.05 8205AA 8205AB 6.53 125.00 18.00 #AA 8205AB 21.42 125.00 18.00 0.00 0.00 0.00 0.00 AA is the top of the Cascades Pitch - P19 8205AB 8205AC 7.63 243.00 54.00 8205AC 8205AD 6.35 136.00 14.00 8205AD 8205AE 6.29 360.00 90.00 8205AE 8205AF 3.20 360.00 90.00 #AD-AF is a 10 m climb 8205AF 8205AG 2.60 208.00 10.00 8205AG 8205AH 6.35 115.00 0.00 8205AH 8205AI 5.35 133.00 2.00 8205AI 8205AJ 3.62 274.00 20.00 8205AJ 8205AK 4.60 285.00 0.00 8205AK 8205AL 5.00 246.00 -17.00 8205AL 8205AM 8.20 210.00 5.00 8205AM 8205AN 5.06 220.00 7.00 8205AN 8205AO 4.63 176.00 18.00 8205AO 8205AP 3.60 154.00 17.00 8205AP 8205AQ 4.68 221.00 3.00 8205AQ 8205AR 8.06 175.00 -33.00 8205AR 8205AS 15.90 360.00 90.00 #R-S is P16 8205AS 8205AT 3.15 135.00 5.00 8205AT 8205AU 5.54 220.00 27.00 8205AU 8205AV 3.90 159.00 20.00 8205AV 8205AX 3.54 79.00 16.00 #There is no Station W 8205AX 8205AY 5.14 147.00 -24.00 8205AY 8205AZ 11.14 360.00 90.00 #Y-Z is P11 8205AZ 8205BA 2.90 148.00 10.00 8205BA 8205BB 2.87 56.00 47.00 8205BB 8205BC 6.40 123.00 8.00 8205BC 8205BD 4.42 83.00 -24.00 8205BD 8205BE 18.85 197.00 -35.00 8205BE 8205BF 2.80 296.00 -28.00 8205BF 8205BG 29.60 360.00 90.00 #This is shown as P29 on the maps (it should have been 30) 8205BG 8205BH 4.60 176.00 60.00 8205BH 8205BI 2.90 217.00 0.00 8205BI 8205BJ 2.87 182.00 1.00 8205BJ 8205BK 4.68 103.00 21.00 8205BK 8205BL 4.19 84.00 15.00 8205BL 8205BM 1.10 360.00 -90.00 8205BM 8205BN 5.73 140.00 9.00 8205BN 8205BO 9.35 113.00 -12.00 8205BO 8205BP 7.00 185.00 18.00 8205BP 8205BQ 3.50 203.00 -8.00 8205BQ 8205BR 11.50 232.00 0.00 8205BR 8205BS 2.91 117.00 3.00 8205BS 8205BT 3.65 198.00 0.00 8205BT 8205BU 3.18 228.00 -10.00 8205BU 8205BV 1.65 150.00 27.00 8205BV 8205BW 3.39 225.00 8.00 8205BW 8205BX 2.12 310.00 -8.00 8205BX 8205BY 3.23 266.00 -24.00 8205BY 8205BZ 2.13 175.00 13.00 8205BZ 8205CA 3.30 111.00 -4.00 8205CA 8205CB 1.75 191.00 0.00 8205CB 8205CC 2.63 261.00 5.00 8205CC 8205CD 2.60 141.00 -4.00 8205CD 8205CE 1.28 198.00 -4.00 8205CE 8205CF 0.80 360.00 -90.00 8205CF 8205CG 3.45 182.00 2.00 8205CG 8205CH 6.65 128.00 6.00 8205CH 8205CI 4.35 165.00 -5.00 8205CI 8205CJ 2.00 158.00 -18.00 8205CJ 8205CK 4.80 211.00 5.00 8205CK 8205CL 3.15 164.00 18.00 8205CL 8205CM 2.65 134.00 8.00 8205CM 8205CN 4.00 195.00 0.00 8205CN 8205CO 3.22 252.00 21.00 8205CO 8205CP 4.00 303.00 -13.00 8205CP 8205CQ 8.30 233.00 0.00 8205CQ 8205CR 3.40 121.00 -12.00 8205CR 8205CS 4.70 185.00 11.00 8205CS 8205CT 3.50 360.00 90.00 8205CT 8205CU 3.90 168.00 29.00 8205CU 8205CV 3.60 181.00 3.00 8205CV 8205CW 7.70 113.00 3.00 8205CW 8205CX 3.55 184.00 -24.00 #From BG to CX is The Crumbles 8205CX 8205CY 9.10 360.00 90.00 #CX-CY is P9 8205CY 8205CZ 2.80 154.00 26.00 8205CZ 8205DA 4.75 198.00 42.00 8205DA 8205DB 9.73 173.00 0.00 8205DB 8205DC 8.80 145.00 8.00 8205DC 8205DD 2.92 212.00 13.00 8205DD 8205DE 5.90 203.00 -30.00 8205DE 8205DF 9.75 360.00 90.00 #This is P10 8205DF 8205DG 5.55 156.00 5.00 8205DG 8205DH 13.14 360.00 90.00 #This is P13 8205DH 8205DI 1.40 85.00 65.00 8205DI 822401 3.92 155.00 3.00 #Surveying out from near the top of P36 to the top of the Cascades Pitch date 1982.08.05 820601 820602 12.10 22.00 -12.00 #Station 1 is on the western wall overlooking P36 820602 820603 6.10 360.00 90.00 #This is P6 820603 820604 4.80 330.00 0.00 #Now entering the far end of Dripping Blood Passage 820604 820605 3.60 15.00 10.00 #Now entering the far end of Dripping Blood Passage. Stations 4 and 5 are on the western wall 820605 820606 6.60 88.00 26.00 #Shot across the passage. Station 6 is on the eastern wall 820606 820607 6.70 10.00 -2.00 820607 820608 4.40 36.00 -4.00 820608 820609 5.80 316.00 -1.00 #Station 9 is on the western wall 820609 820610 3.20 83.00 30.00 820610 820611 6.80 316.00 0.00 820611 820612 7.70 355.00 -9.00 820612 820613 7.60 65.00 6.00 820613 820614 8.10 110.00 3.00 #Stalactite between 13 and 14 820614 820615 11.00 118.00 4.00 820615 820616 13.30 149.00 -5.00 820616 820617 14.10 120.00 5.00 820617 820618 11.40 140.00 10.00 #Stations 17 and 18 are on the south-western wall 820618 820619 6.80 107.00 -10.00 820619 820620 5.40 210.00 -9.00 820620 820621 6.00 137.00 20.00 820621 820622 8.30 230.00 22.00 #Small sump north-west of 22 820622 820623 6.80 247.00 0.00 820623 820624 3.10 247.00 -21.00 820624 820625 4.70 160.00 6.00 #Shots 4-25 are in Dripping Blood Passage. Chert wall between 24 and 25 820625 820626 11.10 360.00 90.00 #This is P12 (I presume station 25 was off the floor) 820626 820627 11.60 150.00 17.00 820627 820628 19.00 360.00 90.00 #This is P19 820628 820629 4.30 270.00 0.00 820629 820630 3.40 242.00 0.00 820630 820631 4.62 165.00 18.00 820631 820632 8.60 280.00 0.00 820632 820633 1.90 300.00 20.00 820633 820634 5.60 270.00 2.00 #Station 34 is at The Wrectum 820634 820635 4.40 180.00 23.00 820635 820636 2.60 250.00 0.00 820636 820637 6.80 100.00 10.00 #Stations 37 is on the eastern wall 820637 820638 4.80 165.00 39.00 820638 820639 8.20 155.00 45.00 820639 820640 7.10 225.00 5.00 820640 820641 6.80 160.00 7.00 820641 820642 9.50 95.00 -22.00 820642 820643 11.20 360.00 90.00 #This is P11 820643 820644 9.00 95.00 5.00 820644 820645 6.50 105.00 15.00 820645 820646 29.00 360.00 90.00 #This is P29 820646 820647 8.00 115.00 20.00 820647 820648 15.00 115.00 25.00 820648 820649 8.00 175.00 36.00 820649 820650 5.10 190.00 0.00 820650 8205AA 18.60 360.00 90.00 #This is P19, the Cascades Pitch #Beyond Dripping Blood Passage - surveying out from just below P10 to the top of P36. date 1982.08.07 820701 820702 3.13 172.00 -24.00 820702 820703 10.37 360.00 90.00 #This is P10 820703 820704 1.58 234.00 14.00 820704 820705 3.93 171.00 13.00 820705 820706 2.46 125.00 20.00 820706 820707 3.62 119.00 -4.00 820707 820708 8.91 72.00 54.00 820708 820709 2.46 46.00 41.00 820709 820710 1.99 84.00 44.00 820710 820711 3.76 62.00 0.00 820711 820712 4.92 127.00 31.00 820712 820713 3.92 116.00 60.00 820713 820714 6.84 109.00 37.00 820714 820715 7.45 167.00 3.00 820715 820716 7.08 117.00 -12.00 820716 820717 4.00 119.00 -42.00 820717 820718 3.77 63.00 1.00 820718 820719 6.99 99.00 0.00 820719 820720 11.12 81.00 -28.00 820720 820721 7.95 360.00 90.00 #This is P8 820721 820722 8.03 140.00 -6.00 820722 820723 36.19 360.00 90.00 #This is P36 820723 820601 2.00 32.00 -1.00 #Tie in to previous survey #Surveying out from the 1982 terminus. Survey was started on 7th August, completred on the 8th date 1982.08.08 8208A1 8208A2 35.00 100.00 34.00 #Starts at a too-tight rift but with a roar of water beyond 8208A2 8208A3 8.30 39.00 9.00 8208A3 8208A4 11.20 85.00 44.00 #Climb 8208A4 8208A5 4.60 134.00 0.00 8208A5 8208A6 5.50 360.00 90.00 8208A6 8208A7 5.20 360.00 90.00 #Shots 5-7 are P10 8208A7 8208A8 18.80 64.00 23.00 8208A8 8208A9 5.30 360.00 90.00 #A8 8208A9 17.39 360.00 90.00 0.00 0.00 0.00 0.00 A 5.3 m pitch, looks like the one shown as P6 on my 1982 map 8208A9 8208A10 7.50 64.00 34.00 8208A10 8208A11 7.20 360.00 90.00 #A10 8208A11 23.62 360.00 90.00 0.00 0.00 0.00 0.00 A 7 m climb 8208A11 8208A12 12.20 40.00 36.00 #Narrow rift 8208A12 8208A13 6.10 58.00 0.00 #0.5 m wide rift 8208A13 8208A14 8.20 120.00 0.00 8208A14 8208A15 4.70 55.00 0.00 8208A15 8208A16 2.80 360.00 -90.00 8208A16 8208A17 2.00 84.00 0.00 8208A17 8208A18 2.70 189.00 0.00 8208A18 8208A19 8.80 119.00 0.00 8208A19 8208B1 38.30 360.00 90.00 #This is P38 8208B1 8208B2 5.60 161.00 0.00 8208B2 8208B3 5.30 254.00 40.00 8208B3 8208B4 4.80 218.00 19.00 8208B4 8208B5 5.00 223.00 -24.00 8208B5 8208B6 4.50 213.00 0.00 8208B6 8208B7 5.50 312.00 -32.00 8208B7 8208B8 2.50 307.00 0.00 8208B8 8208B9 12.20 204.00 18.00 8208B9 8208B10 2.80 360.00 -90.00 8208B10 8208B11 5.00 102.00 -32.00 8208B11 8208B12 4.90 146.00 38.00 8208B12 8208B13 7.00 81.00 0.00 8208B13 8208B14 3.80 150.00 22.00 8208B14 8208B15 7.10 213.00 0.00 8208B15 820701 4.60 193.00 -10.00 8208A19 53 67.07 359.00 -74.74 53 54 23.53 53.00 0.00 54 55 41.18 10.00 0.00 55 56 136.82 344.00 -25.46 56 57 64.97 300.00 -5.19 57 58 59.12 32.00 -5.71 58 59 145.28 13.00 -21.37 59 60 201.12 295.00 -54.20 endcenterline #input "sima56-plan-outline.th2" input "sima56-1p.th2" input "sima56-1s.th2" #map-outline m1p -projection plan #sima56-plan-outline #endmap map m1p -projection plan sima56-1p break sima56-2p break sima56-3p break sima56-4p break sima56-5p break far_canal-1p break far_canal-2p break far_canal-3p break far_canal-4p break sima56-6p endmap map m1s -projection extended sima56-1s break sima56-2s break sima56-3s break sima56-4s endmap endsurvey