*begin DR2000_JurassicHighway *date 2018.09.07 *team Dave Powesland *team Arwel Roberts *export 12 0 *data normal from to direction tape compass clino ignoreall ;0 1 B 2.73 24.3 23.6 ;1 2 B 6.56 51.6 16.7 ;2 3 B 5.51 17.9 -51.9 ;3 4 B 5.18 341.4 -9.9 ;4 5 B 6.76 356.9 -20.3 ;5 6 B 5.02 352.8 -24.6 ;6 7 B 4.80 355.6 -43.9 ;7 8 B 4.71 350.1 -41.3 ;8 9 B 5.13 31.8 -25.4 ;9 10 B 5.92 14.5 -48.4 ;10 11 B 4.78 94.3 -48.5 ;11 12 B 5.76 21.7 43.4 1 0 2.73 24.3 23.6 2 1 6.56 51.6 15.7 3 2 5.51 17.9 -51.9 4 3 5.18 341.4 -9.9 5 4 6.76 356.9 -20.3 6 5 5.02 352.8 -24.6 7 6 4.80 355.6 -43.9 8 7 4.71 350.1 -41.3 9 8 5.13 31.8 -25.4 10 9 5.92 14.5 -48.4 11 10 4.78 94.3 -48.5 12 11 5.76 21.7 43.4 *data passage station left right up down ignoreall 0 1 0 6 1.5;spike on up ramp sand and smag existing 1 0 2 5 2 ;step into meander 2 1.5 1 22 1 ;r/h before stomp at waterfall 3 2 0 22 1 ;calcite from top of pitch 4 0 2.5 14 1 ;r/h wall 5 2 0 16 1.5;l/h wall 6 0 1.5 20 1 ;r/h wall at bottom rope 7 2 1 18 1 ;top of pitch 2 8 0 4 15 4 ;r/h wall enters break down chamber 9 3 0 6 12 ;top of pitch from break down 10 0 1 20 2 ;existing single bolt re-belay 11 0 2 18 1 ;existing toppex ledge dinosaur aven where started ; 12 existing point before pool *end DR2000_JurassicHighway