*begin Tinkerbell_BigPitch *export 1 3 25 40 *date 1977.08.31 ;not sure on year *team "Dave Checkley" ;survey of DC extension, Big Pitch, Stream and link to Colin's Climax *data normal from to direction tape compass clino 1 2 12.6 278 12 2 3 15 48 -19 1 4 8.7 182 15 4 5 6.9 137 10 5 6 6.9 226 5 6 7 6.2 287 41 7 8 6.5 216 18 8 9 6 161 -17 9 10 15.8 261 -19 10 11 14.4 167 -24 11 12 17 244 -27 12 13 11 242 -41 13 14 15.3 224 -19 ;between stn 13 and 14 is 25m pitch in floor? 14 15 13.7 325 11 15 16 3.8 11 11 ;between 15 and 16 is 10m climb down into pit 16 17 5.3 298 -13 ;Crysal pool, tinkerbell traverse 17 18 13.2 174 -26 18 19 2.4 148 -46 19 20 12 148 -90 ;P12 20 21 12.5 249 -13 21 22 30 249 -90 ;big pitch ;foot of big pitch to streamway 22 23 22.1 262 -18 23 24 10.8 259 -37 24 25 24 267 -30 25 26 25.9 141 4 ; compass 290 from stn25 leads to upstream lake 26 27 4.3 152 26 27 28 7.2 157 3 28 29 10 138 -29 ;stn 29 at bering of 140 leads to downstream lake ;foot of big pitch to colins climax 22 30 8.6 104 9 30 31 4 23 -18 31 32 9.9 72 -47 32 33 6.8 164 5 33 34 7 185 21 34 35 10 125 -14 35 36 4.5 162 0 36 37 20.1 156 11 37 38 16 175 -1 38 39 14.6 134 -16 39 40 4.4 55 -31 40 41 8 55 -90; P8 ;*data passage station left right up down ignoreall *end Tinkerbell_BigPitch