*begin BoomingCatacombs *export 0 *date 1970.01.01 *team "Phil Walker" digitiser ;digitised from a rotated north sketch. Sefton (1984 - Cave Science states 'heads away from the stream', rift climbs references route up to Scrambled Egg ; so assuming P22 from maze is 'upstream' of Bloody Lake, the original 70's sketch has North to top of page ;from to tape compass clino 0 0A 11.76470588 70 -30 ;bottom of P22 from maze 0 1 13.97058824 0 0 1 2 11.76470588 218 0 2 3 11.76470588 0 10 3 4 11.76470588 279 2 4 5 14.70588235 334 0 5 6 14.70588235 23 0 ;c30 up rift to underneath scrambled egg chamber 6 6a 8.823529412 60 -45 6 7 4.411764706 0 90 ;P5 up 7 8 8.823529412 101 0 8 9 15.44117647 42 0 9 10 10.29411765 329 -2 10 11 29.41176471 0 -90 ;P30 (150 series) 11 11A 14.70588235 76 0 11A 11B 10.29411765 0 -90 ;P10 11B 11C 0.735294118 147 0 11C 11D 10.29411765 0 -90 ;P10 11D 11E 2.205882353 270 0 11E 11F 8.823529412 0 -90 ;P8 11F 11G 1.470588235 340 0 11G 11H 3.676470588 79 0 11H H1 5.147058824 285 0 ;downstream to sump 11H H2 2.205882353 115 0 ;upstream to sump 11 12 2.941176471 0 0 12 13 12.5 266 0 13 14 15.44117647 285 0 14 15 11.02941176 266 0 15 16 6.617647059 296 0 16 16A 13.97058824 270 0 16 17 11.76470588 64 0 17 18 6.617647059 8 0 18 19 7.352941176 41 5 19 20 16.17647059 0 -90 ;P17 20 21 4.411764706 345 0 21 22 4.411764706 51 -2 ;stn 21 is connection to bypass from above the P17 22 23 18.38235294 16 -3 23 24 25 4 -2 24 25 23.52941176 23 -3 25 25A 5.147058824 317 0 ;stn25A crawl to canal and sump 25 26 25 35 -2 26 27 12.5 0 -90 ;P13 to flooded shaft *data passage station left right up down ignoreall 0 11.02941176 0 19.85294118 0 ;bottom of P22 from maze 0 5.147058824 9.558823529 19.85294118 0 1 2.941176471 12.5 19.85294118 0 2 0 14.70588235 5.147058824 0 3 11.02941176 0 5.147058824 0 4 0 6.617647059 7.352941176 0 5 4.411764706 2.941176471 29.41176471 0 ;c30 up rift to underneath scrambled egg chamber 6 3.676470588 2.205882353 4.411764706 0 6 3.676470588 2.205882353 4.411764706 0 ;P5 up 7 3.676470588 2.205882353 1.470588235 4.411764706 8 8.088235294 0 1.470588235 0 9 8.088235294 0 1.470588235 0 10 0 3.676470588 3.676470588 29.41176471 ;P30 (150 series) 11 3.676470588 0 29.41176471 0 11A 0 0.735294118 0.735294118 10.29411765 ;P10 11B 0 0.735294118 11.02941176 0 11C 0.735294118 0 0.735294118 10.29411765 ;P10 11D 0 0.735294118 11.02941176 0 11E 0.735294118 0 0.735294118 8.823529412 ;P8 11F 0 0.735294118 11.76470588 0 11G 0 0.735294118 0.735294118 0 11H 1.470588235 0 1.470588235 0 ;downstream to sump 11H 0 1.470588235 1.470588235 0 ;upstream to sump 11 0 4.411764706 29.41176471 0 12 0 2.941176471 29.41176471 0 13 0 2.205882353 23.52941176 0 14 1.470588235 0 22.05882353 0 15 0 18.38235294 22.05882353 0 16 2.205882353 0 16.17647059 0 16 0 3.676470588 22.05882353 0 17 9.558823529 7.352941176 16.17647059 0 18 7.352941176 8.088235294 22.05882353 0 19 1.470588235 5.882352941 7.352941176 16.17647059 ;P17 20 0.735294118 2.205882353 22.05882353 0 21 0 0.735294118 1.470588235 0 ;stn 21 is connection to bypass from above the P17 22 1.470588235 0 2.205882353 0 23 2.205882353 0 2.205882353 0 24 0 2.205882353 2.941176471 0 25 14.70588235 0 2.205882353 0 ;stn25A crawl to canal and sump 25 0 1.470588235 1.470588235 0 26 1.470588235 2.941176471 1.470588235 12.5 ;P13 to flooded shaft ;************************************************************** ;**BOOMING CATACOMBS - ORIGINAL DJC DIGISTISED - WEST TO EAST** ;************************************************************** ;from to tape compass clino ;78 2 28.2842712475 135 0 ;2 3 40 0 -90 ;3 4 33.1662479036 71.5650511771 -17.5484006138 ;4 5 20 0 -90 ;5 6 64.8074069841 51.3401917459 -8.876395081 ;6 7 20 0 -90 *end BoomingCatacombs