encoding utf-8 survey Pierres2 centreline date 2010.03.05 team "Kevin Hilton" team "Claire Cohen" #data normal from to tape compass clino #leg added by GJM to estimate sump 1 #P1sump P2D1 18 045 0 #data dimensions station left right up down #P1sump 0.5 0.5 0 0.6 #removed no longer needed data normal station left right up down newline direction tape compass clino calibrate tape 0.02 P2D1 1 0.4 0 0.37 #Top of sump pool b 3.88 122.0 -3.0 P2D2 0.2 1 0.2 0.4 #"Left side passage just above bolt" F 5.64 289.0 -3.0 P2D3 0.7 0.6 0 0.43 #Roof pendant f 4.97 330.0 0.0 P2D4 0.93 0.33 0 0.34 #Roof pendant f 2.54 16.0 -1.0 P2D5 0.92 0.4 0 0.3 #Roof Pendant f 4.22 312.0 10.0 P2D6 1.57 0 0 0.53 #Right hand wall f 0.26 312.0 -90.0 P2D7 - - 0 - #Drop to floor b 1.41 82.0 -10.0 P2D8 1.3 0.5 0 0.5 #Roof pendant f 2.42 341.0 7.0 P2D9 1.02 1.08 0 0.53 #Left wall f 5.80 58.0 -4.0 P2D10 2.1 0.86 0 0.5 #Right hand wall f 3.45 295.0 3.0 P2D11 0.91 - 0 0.74 #Pendant f 4.10 30.0 -5.0 P2D12 0.4 0 0 - #Right wall just above sump endcentreline endsurvey