*begin UpperLevelLink ;surveyors: Footleg, Caroline Fretwell ;name: ;date 060802 *CALIBRATE declination 2.42 ;declination is 2 41' (2.68) for 2004 changing by 8'E per year. ; 2.55 used for 2005 ; 2.42 used for 2006 ; 2.28 used for 2007 ; 2.15 used for 2008 ;stn 0= stn 10 (carbide marking on boulder) in high level passage 1 0 5.95 265 35; 0.75 0.75 2.5 0.5 2 1 7.78 292 -1; 0 1 2.5 3 3 2 7.99 245 -2; 3 5 1 0.75 4 3 4.07 - +v; 2 2 - 0 5 4 8.36 223 24; 1 3 3 0.75 6 5 6.26 264 10; 0 1.5 0.5 1 7 6 10.56 355 -2; 4 0 0.75 2 8 7 9.83 285 10; 2.5 0 1 1.75 9 8 12.02 248 -4; 0 1.5 0.2 1 10 9 6.51 300 -8; 4 2 1 1 11 10 11.70 310 3; 5 0 0.5 1 12 11 17.48 249 1; 3.5 3 1.25 0.4 ;stn 12 = old survey marker (orange tape on heap of rocks) at junction with catprint passage 13 12 11.01 176 -3; 0 2 .5 2 14 13 10.36 165 3; 3.5 2 3 0 15 14 7.20 168 -12; 1.75 0 .75 1.25 ;stn 15 is at junction with passage going south 16 15 27.89 125 -2; 0 4 1 2 17 16 16.28 132 6; 4 2.5 3 0.5 18 17 2.96 234 6; 0.75 1.75 1 0.3 19 18 16.85 286 -4; 2.5 2 1 1.5 ;stn 19 = tip of longer stal on roof, junction with swirl chamber 20 19 9.45 176 0; 0 3 2 1.5 21 20 8.33 279 -6; 0 3 2.5 1.5 22 21 3.49 244 19; 0.5 0.5 0 0.75 23 22 4.49 245 -18; 3 0 0.4 1.25 ;stn 23 = stn 0 of inlet survey (easter 06) 24 23 9.30 119 -1; 1 0 0.5 1 25 24 4.69 77 10; 0 1.75 0.5 0.75 26 25 17.42 118 -1; 1 0 1.75 1.5 27 26 4.20 88 -41; 0 1.5 1.25 1.75 28 27 9.58 168 -10; 3.5 0 2 2 29 28 7.23 164 30; 3 0 2 0.75 30 29 3.25 114 3; 0 1 1.8 0.5 31 30 6.30 157 4; 2 0 1.5 0.5 32 31 7.30 106 -14; 0 1 0.5 0.75 33 32 12.12 119 -10; 3 0.75 0 1.25 34 33 12.10 85 -1; 0 3 0.5 1.75 35 34 19.47 106 -1; 1.5 0.5 0.3 0.75 36 35 14.68 106 -2; 0.4 2.25 1 1 37 36 26.27 114 -2; 2 0 1.75 1 38 37 20.38 114 -2; 1.25 1 1 0.3 39 38 27.30 123 -6; 2.75 0 0.5 1.25 40 39 19.16 112 3; 1.75 1 0.75 0 41 40 6.97 75 5; 0.75 5 1 2 ;stn 41 = top of broken stalagmite directly over stream *end UpperLevelLink