; Warning: SVX file generated by Tunnel. Do not edit. To change, edit your original files and save on top. ;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;; *begin extnoffentranceinlet *EXPORT 815 *data normal from to tape compass clino ignoreall *units length metres *calibrate tape 0.0 *units compass degrees *calibrate compass 0.0 *units clino degrees *calibrate clino 0.0 ;end generated presettings ;Extension at head of pitch in entrance series (Scan-08) ;surveyors unknown ;date unknown *CALIBRATE declination 0 ;Magnetic deviation may have already been subtracted from all these compass readings ;as has been done for other sections? ;Moved start of this survey to the top of the pitch in the entrance series as I visited it ;on 30/07/06 and confirmed it goes off at pitch head, not below as previously tied in to survey ;Footleg 01/08/06 815 370 1.50 214.95 0 ;(Scan-08) 370 371 1.40 98.95 0 ;* 371 372 2.78 209.95 38 ;* 372 373 6.75 62.95 1 ;* 373 374 1.75 - up ;* 374 375 4.65 288.95 14 ;* 375 376 8.25 303.95 19 ;* 376 377 6.10 250.95 20 ;* 377 378 2.71 276.95 25 ;* 378 379 4.65 232.95 2 ;* 379 380 4.58 297.95 30 ;* 380 381 5.31 245.95 22 ;* *end extnoffentranceinlet