*BEGIN 0122-09-02 ;surveyors: Jim Davis Terry Whitaker ;passage name: Croissant *DATE 2009.04.13 ;*CALIBRATE DECLINATION 2.08 ; ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ ; 11/12/13 - Adjust magnetic declination so centre line ; surveys are aligned to Eur 79 grid rather than True North. ; Applying correction of -0.4 to original magnetic readings in ; Survex aligns to Eur79 grid. ; ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ *CALIBRATE DECLINATION 1.66 20 21 .74 329 0 21 22 5.23 179 -48 22 23 1.2 152 0 23 24 5.94 210 -14 24 25 .8 110 -10 25 26 3.47 180 2 26 27 6.71 195 1 27 28 1.75 225 -2 28 29 5.5 - up 29 30 11.66 213 0 30 31 9.5 173 -2 31 32 1 116 0 32 33 6.55 - down 33 34 23 190 42 34 35 .7 - down; boulder survey stn 35 (paper = stn 7 on 0122_09_01) *data passage station up down left right 20 .5 .5 2 .5; survey stn at stal on true left of p top 21 1 .8 1.5 .5; Croissant-looking stal; stream sinks at base 22 6.5 .5 .5 1 23 5.5 1.8 .8 .5 24 6 .5 1 .2; passage through flowstone boss; pools follow 25 4.2 1.5 .6 1.8 26 6.2 .5 .4 1.5; stream under flowstone; false floor 27 3 2 2 1; Cyclone - pile of gravel in centre 28 6.1 1.6 .25 .25 29 .8 .8 .5 5.5 30 .4 .2 2 .4 31 1 1.5 3 .2; rope climb 32 2 6.55 2 1.8 33 8.55 .4 4 2 *END 0122-09-02