*BEGIN 0672_Regato ;Created from Survey file on Sun,20 Jun 2004.18:12:10 ;Dates surveyed : 940729&940805&940807&940810&950528&950528&950528&950528&950606&970729&970801 ;Surveyors : Juan AndyQ RobMurg +Toby Jane PeteS ;No of stations : 280 ;Plan length : 1379.92729m ;Traverse length: 1552.1m ;*FIX 1994S.0 454480 4802130 0257 ;*FIX 1994S.0 454378 4801921 0257; --- *FIX coordinates (usually entrances) changed to ETRS89 datum by applying x-102 and y-209 --- March 2014 *FIX 1994S.0 454378 4801921 0255 ;+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ ;Altitude altered to agree with new digital maps, March 2014 ;+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ *ENTRANCE 1994S.0 *entrance 1994S.103 *BEGIN 1994S ; +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ ; 11/12/13 - Add correcting magnetic declination line so centre ; line surveys are aligned to Eur 79 grid rather than True North. ; Old magdev appears to be 3.9 degrees but should have been 4.08 to ; align to True North. This value is reduced by 0.4 degrees below ; to align to Eur79 Grid North. (4.08-3.9-0.4) ; +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ *CALIBRATE DECLINATION -0.22 0 1 6.60 86.60 -42 ;top entr; pass above unentered 1 2 5.00 95.60 -30 ;head of drop 2 3 5.30 210.10 -31 ;* 2 4 5.10 86.10 -32 ;* 4 5 1.00 - -V ;* 5 6 3.60 123.10 5 ;* 6 7 3.40 168.10 9 ;* 7 8 7.60 94.60 6 ;* 8 9 7.00 154.10 -25 ;* 9 10 3.50 107.10 2 ;old calcite flows 10 11 3.40 161.10 -23 ;* 11 12 3.60 56.10 -30 ;* 12 13 5.10 82.10 20 ;routes round on right 13 14 3.80 97.60 0 ;* 14 15 7.10 7.60 8 ;* 15 16 16.50 93.10 10 ;sand floor 16 17 5.50 100.60 -23 ;junction 17 18 7.00 14.10 14 ;thro stal 18 19 3.30 354.60 14 ;p head 19 20 20.00 356.10 30 ;approx only 19 21 9.00 - -V ;* 17 22 1.00 - -V ;* 22 23 5.50 213.10 -10 ;* 23 24 3.00 244.10 5 ;pass back on R 24 25 3.10 191.10 -12 ;* 25 26 3.30 153.10 -24 ;* 26 27 6.10 268.10 -32 ;* 27 28 6.30 181.60 -10 ;junction 28 29 12.60 114.10 2 ;* 29 30 12.70 109.10 -4 ;* 30 31 10.50 168.10 -20 ;* 31 32 10.20 173.60 -10 ;* 32 33 2.00 87.10 -22 ;start of traverse 33 34 11.90 189.10 -2 ;end of traverse 34 35 4.10 247.10 20 ;* 35 36 3.90 254.10 -15 ;* 36 37 5.80 298.10 0 ;conts v small above clay bank 30 38 2.50 126.10 0 ;* 38 39 2.20 96.10 -5 ;crawl; small 39 40 2.70 132.10 0 ;* 40 41 2.90 99.60 0 ;* 41 42 1.80 63.60 1 ;* 42 43 2.20 104.10 20 ;* 43 44 5.00 353.60 20 ;bigger 44 45 1.10 309.10 28 ;* 45 46 3.80 .60 7 ;tight calcite slope up; slight draught down 28 47 2.20 276.10 -15 ;calcite slope down 47 48 5.50 176.10 -30 ;* 48 49 3.60 205.10 -15 ;* 49 50 2.20 236.10 5 ;* 50 51 10.10 277.60 -21 ;thro blowhole 51 52 8.20 177.10 -32 ;over cl down 52 53 11.00 183.10 3 ;* 53 54 9.70 156.10 -18 ;* 54 55 7.20 172.10 -9 ;stn on boulders 55 56 11.00 118.10 16 ;tight no draught 55 57 8.60 191.10 -23 ;over 2m cl down 57 58 3.00 205.10 -39 ;* 58 59 7.90 177.10 -10 ;stn near entr to crawl under for other entr 59 60 5.20 177.10 0 ;* 60 61 2.00 189.60 2 ;* 61 62 4.40 160.10 0 ;cl to pass 4m above 17 63 0.90 - +V ;stn 0 63 64 5.00 139.10 4 ;* 64 65 5.80 108.10 34 ;stn 2 17 66 4.30 24.10 8 ;stn A0 66 67 6.30 102.10 11 ;* 67 68 1.70 89.10 12 ;* 68 69 5.10 58.10 23 ;stn A3; 8m unsurveyed ends too tight 55 70 12.00 350.10 16 ;stn B0 70 71 2.40 311.10 11 ;* 71 72 3.30 97.10 30 ;* 72 73 5.90 163.10 32 ;* 73 74 7.30 118.10 2 ;stn B4;tight with vocal connection to E 71 75 5.40 351.10 15 ;stn C0 75 76 4.60 10.10 4 ;* 76 77 4.40 2.10 -14 ;* 77 78 8.50 187.10 -31 ;* 78 79 2.30 210.10 -40 ;* 79 80 2.80 108.10 -25 ;* 80 81 6.10 171.10 -32 ;stn C6; chossy filled dig 62 82 4.90 - +V ;stn D0 82 83 11.40 136.10 13 ;* 83 84 3.50 155.10 -8 ;Stn D2; edge of blind p20; traverse to choked chmbr 82 85 20.90 272.10 3 ;stn DA0 85 86 18.50 291.10 -2 ;stn DA1 85 87 5.60 1.10 -37 ;stn E2 87 88 5.20 19.10 -43 ;* 88 89 8.10 236.10 -19 ;* 89 90 6.80 288.10 7 ;stn E1 85 91 11.00 295.10 -3 ;stn E0 91 92 7.90 - -V ;stn E1 92 93 3.90 228.10 17 ;stn E5 93 94 7.40 204.10 -17 ;* 94 95 7.80 311.10 57 ;stn E7 95 96 4.30 266.10 -4 ;* 96 97 15.30 301.10 -3 ;* 97 98 9.50 289.10 -5 ;* 98 99 5.70 333.10 -46 ;stn E11 99 100 4.50 205.10 29 ;* 100 101 2.90 287.10 27 ;* 101 102 9.70 339.10 26 ;* 102 103 18.50 288.10 12 ;E15 lower entrance 103 104 4.40 295.10 24 ;tree in shakehole 104 105 9.80 109.10 -20 ;xx 105 106 13.00 104.10 -12 ;xx 106 107 9.80 358.10 -23 ;* 107 108 3.80 17.10 -45 ;* 108 109 4.20 3.10 -7 ;* 109 110 7.60 339.10 3 ;* 110 111 6.30 2.10 22 ;* 111 112 5.80 344.10 36 ;* 112 113 7.10 - -V ;pot in floor 112 114 5.10 284.10 51 ;* 114 115 11.90 346.10 9 ;* 115 116 6.50 324.10 15 ;* 116 117 5.90 339.10 18 ;* 117 118 5.20 6.10 0 ;rift stals up; roots 108 119 3.50 153.10 -13 ;* 119 120 7.20 146.10 4 ;top of drop 120 121 6.20 166.10 0 ;* 121 122 6.30 159.10 38 ;loop closure to E10 121 123 1.20 169.10 -4 ;* 123 124 9.60 186.10 -9 ;eucalyptus 124 125 4.80 129.10 -30 ;junction 125 126 12.50 175.10 -9 ;* 126 127 5.00 160.10 0 ;* 127 128 8.40 171.10 -17 ;traverse over 3m drop 128 129 4.20 162.10 -7 ;* 129 130 10.30 183.10 -7 ;* 130 131 12.90 171.10 -7 ;orbitolina starts 131 132 8.60 270.10 -11 ;hole in roof 132 133 14.80 244.10 -37 ;chamber 133 134 12.00 273.10 14 ;end of large chamber 134 135 7.70 193.10 -20 ;* 135 136 4.50 280.10 -21 ;decorated chamber 136 137 14.60 269.10 -2 ;* 137 138 4.10 162.10 -9 ;flat out crawl 138 139 16.50 100.10 5 ;* 139 140 7.10 112.10 8 ;junction between 2 drops 136 141 4.40 7.10 -50 ;steep hading rift 141 142 5.30 321.10 -53 ;* 142 143 5.50 57.10 -29 ;top of 5m pit 143 144 7.10 84.10 0 ;tight draughting hole; Toby-sized? 133 145 9.90 134.10 13 ;stal grotto; choked 133 146 3.60 140.10 -32 ;head of pitch 146 147 5.00 - -V ;* 147 148 2.30 353.10 -32 ;* 148 149 1.80 326.10 5 ;* 149 150 3.40 73.10 -1 ;* 150 151 2.70 353.10 -6 ;* 151 152 4.70 42.10 -4 ;* 152 153 7.70 66.10 -5 ;* 153 154 8.90 67.10 1 ;* 154 155 7.40 81.10 15 ;* 155 156 3.10 132.10 8 ;* 156 157 11.80 99.10 10 ;* 157 158 9.50 77.10 9 ;* 158 159 6.90 27.10 16 ;* 159 160 1.00 - -V ;* 160 161 3.40 341.10 40 ;* 161 162 3.20 52.10 40 ;* 162 163 2.80 302.10 30 ;small tube conts v tight *END 1994S *EQUATE 1994S.140 1995W.140 *EQUATE 1994S.157 1995W.157 *BEGIN 1995W ; +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ ; 11/12/13 - Add correcting magnetic declination line so centre ; line surveys are aligned to Eur 79 grid rather than True North. ; Old magdev appears to be 3.75 degrees but should have been 3.95 to ; align to True North. This value is reduced by 0.4 degrees below ; to align to Eur79 Grid North. (3.95-3.75-0.4) ; +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ *CALIBRATE DECLINATION -0.2 140 164 1.00 358.25 0 ;* 164 165 15.40 - -V ;pitch base 165 166 4.00 7.25 -32 ;* 166 167 5.90 352.25 33 ;* 167 168 6.70 74.25 -3 ;small muddy chamber 165 169 7.10 177.25 35 ;* 169 170 1.35 - -V ;* 170 171 8.00 289.25 -13 ;* 171 172 1.00 - +V ;* 172 173 3.80 290.25 -3 ;* 173 174 5.75 234.25 -5 ;chamber middle 174 175 8.20 178.25 9 ;tight 174 176 3.50 303.25 -34 ;conts down to T junction continuing 157 177 2.00 176.25 0 ;guessed leg 177 178 7.00 - -V ;* 178 179 3.00 241.25 -7 ;* 179 180 3.25 304.25 -30 ;* 180 181 5.50 261.25 -2 ;* 181 182 2.90 179.25 0 ;* 182 183 3.80 255.25 -2 ;* 183 184 5.10 226.25 -3 ;conts low and wet *END 1995W *EQUATE 1994S.151 1997S.151 *EQUATE 1994S.59 1997S.59 *BEGIN 1997S ; +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ ; 11/12/13 - Add correcting magnetic declination line so centre ; line surveys are aligned to Eur 79 grid rather than True North. ; Old magdev appears to be 3.45 degrees but should have been 3.64 to ; align to True North. This value is reduced by 0.4 degrees below ; to align to Eur79 Grid North. (3.64-3.45-0.4) ; +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ *CALIBRATE DECLINATION -0.21 151 185 0.60 201.25 10 ;stn A12 to 2 185 186 6.90 115.25 -38 ;connects to other pass 186 187 7.60 126.25 -6 ;up steep mud slope 59 188 3.10 4.55 2 ;* 188 189 3.80 304.05 4 ;chk & soln pocket 188 190 6.80 358.55 23 ;base of cl stn 3 190 191 2.70 239.55 45 ;cl in 1m diam tube 191 192 4.10 183.55 44 ;* 192 193 3.95 279.55 2 ;* 193 194 6.20 292.55 1 ;stn7 rift L connects with maze 194 195 17.75 287.55 3 ;* 195 196 6.55 314.55 0 ;* 196 197 16.20 353.05 11 ;* 197 198 1.10 263.55 12 ;* 198 199 7.90 347.55 6 ;* 199 200 2.30 291.55 46 ;1.8m cl up 200 201 3.30 17.55 -20 ;1.8m cl down stn 14 201 202 2.20 333.55 12 ;* 202 203 5.20 291.55 43 ;* 203 204 2.10 48.55 -9 ;* 204 205 1.35 65.55 0 ;* 205 206 2.05 9.55 6 ;* 206 207 3.90 292.55 12 ;* 207 208 3.10 328.55 7 ;stn 21 pass conts 6m to wall 59 209 2.50 96.55 2 ;stn 1 209 210 3.10 27.55 16 ;base of cl 210 211 5.00 84.55 75 ;cl up 211 212 8.00 296.55 5 ;over main passage 59 213 4.10 251.55 -4 ;crawl 213 214 2.60 237.55 0 ;4way junction stn 6 214 215 6.50 149.55 -4 ;* 214 216 2.80 329.55 1 ;* 216 217 3.60 245.55 -23 ;* 214 218 1.80 243.55 40 ;soln tube 4m hi above too tight 214 219 2.90 297.55 -74 ;stn 11 219 220 3.20 281.55 17 ;stn 9 220 221 2.80 279.55 -11 ;stn 12 221 222 5.00 177.55 26 ;* 221 223 2.00 237.55 -1 ;* 223 224 3.50 323.55 47 ;stn15 224 225 7.30 179.55 46 ;stn16 224 226 5.30 52.55 65 ;stn17 226 227 2.20 68.55 13 ;* 227 228 5.40 18.55 6 ;* 228 229 2.70 28.55 30 ;stn 20 Bridehead revisited 223 230 4.50 172.55 31 ;* 230 231 7.80 286.55 -22 ;* 231 232 5.00 217.55 8 ;stn23 232 233 1.60 278.55 10 ;* 233 234 2.50 183.55 0 ;* 234 235 6.50 291.55 2 ;* 235 236 1.40 48.55 0 ;stn27 236 237 5.10 97.55 -2 ;stn24 236 238 2.20 286.55 32 ;bolt to pass above stn 28 238 239 3.90 206.55 9 ;* 239 240 7.10 207.55 -11 ;stn 30 marked E6 Spaniards 240 241 10.30 324.55 49 ;* 241 242 1.90 356.55 13 ;* 242 243 2.80 87.55 1 ;stn 33 243 244 5.50 115.55 -5 ;stn 34 244 245 4.40 19.55 11 ;over 27 245 246 7.30 - -V ;stn 27 240 247 4.20 157.55 -1 ;* 247 248 4.50 193.55 20 ;* 248 249 4.50 169.55 -23 ;* 249 250 9.90 308.55 -5 ;stn 39 250 251 10.90 282.55 11 ;* 251 252 8.10 308.55 18 ;* 252 253 3.40 268.55 3 ;* 253 254 5.60 290.55 -11 ;stn43 entr passage 245 255 3.40 294.55 28 ;stn 9 Toby 255 256 7.20 295.55 -26 ;stn8 256 257 4.50 333.55 58 ;* 257 258 5.80 - +V ;stn6 258 259 8.30 336.55 30 ;stn3 Toby 259 260 2.20 336.55 3 ;stn 4 260 261 4.50 18.05 -5 ;stn 5 259 262 27.60 284.55 0 ;stn2 262 263 11.30 318.55 -23 ;stn1 263 264 4.30 201.55 -24 ;some point in traverse tree roots? *END 1997S *END 0672_Regato