*begin illusion_1 *export gps lid 41 42 *title "East Kingsdale - Illusion Pot - from entrance through to hanger at far end of duck" *date 2013.07.07 *team Instruments Julian Todd *team Notes Becka Lawson *instrument Becka's Distox *calibrate tape 0 ; +ve if tape was too short, -ve if too long ;from to tape compass clino remarks *flags surface gps lid 3.58 201 -17 *flags not surface lid 1 11.13 343 -83 2 1 3.37 132 +30 2 3 2.60 326 -49 4 3 4.29 064 +84 5 4 3.43 333 +41 6 5 3.75 093 +85 6 42 1.80 322.5 +02 7 6 3.32 210 -02 ; 7 8 9.55 232 0 ; superceded by illusion_2 survey 9 7 3.52 203 +03 9 10 4.60 163 -10 11 9 14.52 212.5 +04.5 12 11 15.95 242 +01 12 13 2.72 090 +36 13 14 11.97 129 +25 14 15 3.00 - up 16 12 7.96 187 -01 17 16 5.96 225 -01 18 17 12.88 246 +01 19 18 4.14 268 +08.5 20 19 4.39 213 -10.5 21 20 5.99 245 +04 22 21 10.93 247 +01 23 22 11.11 238 +02 24 23 7.29 239 +00.5 23 25 5.00 011 +06 26 24 6.39 228 +03 27 26 9.76 253 0 28 27 10.61 235 0 28 29 5.05 131 +49 28 30 6.86 342 +15 31 28 7.09 205 +01 ; 31 to 30 in notes but sketch looks like it should be 31 to 28 32 31 3.20 278 +17 32 33 9.87 345 +22 34 32 3.14 178 -03 35 34 3.60 289 +03 36 35 5.55 258 -03 36 37 5.61 146 +13 38 36 3.87 202 +06 39 38 9.71 209 +01 40 39 3.26 208 -04 40 41 1.66 341 +42 *data passage station left right up down ignoreall gps - - - - rock in shakehole where took gps lid - - - - point on inner ring of concrete tube at entrance opposite the midpoint of the left and right steps down the tube 1 0.75 0.25 11 0 base of entrance concrete pipe and first (two ladders 2 0.6 0.7 0 1 l wall 3 1.2 0 1.2 6 in roof, level with 3rd rung down of 2nd ladder 4 0.4 0.5 7 1.8 base of 2nd ladder 5 0.6 0.1 1 3.7 top of 3rd ladder 6 2.5 1.2 8 0.2 base of 3rd ladder 7 1.6 0.5 1 0.5 junction with low crawl off back under entrance and main way ahead, on stump of stal, the highest of about 3 and only one directly under a broken stalagtite with pencil number 7 ; 8 0.5 0.5 0.2 0.2 unmarked up low crawl, needs surveying properly then take this station out ; now superceded by illusion_2 survey 9 0.5 1.8 0.4 0.8 boulder tip 10 - - - - inlet, too tight to enter 11 0.4 1.8 0.9 0.1 floor of main passage 12 1 2.3 1.2 0.2 bottom tip of large, obvious stalagtite at junction 13 0.3 06 2.3 1.5 tip of boulder 14 0.3 0 3 1.8 numbered on right wall, end of inlet 15 - - - - unmarked at top of drippy inlet with boulders in 16 0.4 2.5 0.4 0.5 l wall 17 0.6 1.5 0.4 0.8 l wall 18 0.6 1.2 0.3 1.1 l wall 19 1.9 0.5 1.1 0.8 corner of r wall 20 0.5 0.5 0 1.8 l wall at stal and start of mud crawl 21 0.8 0.3 0.3 0.5 low crawl 22 2 0.4 1.5 0.4 stal boss at end of low mud crawl 23 1.8 0.4 1.1 0.8 r mud bank; can't really read the down but definitely 0.something 24 1.5 1.3 1 1.1 25 - - - - end of side alcove 26 3 0.5 0.6 1.2 27 2.5 0.7 0.5 0.7 down unclear 28 5 4 5 2.5 29 - - - - end of alcove 30 - - - - end of alcove 31 0.4 2 1.5 1.6 32 3 1 6 0.3 33 - - - - end of side alcove 34 0.1 1 0.3 0.3 start of low crawl with hosepipe and after initial dam (but not duck) 35 2 0 1 0.1 still in low crawl 36 3 4 3 0.5 in mini chamber inbetween two low crawls 37 - - - - base of drippy tight high inlet 38 0 2 0.4 0.4 start of rope through duck 39 0.4 0.4 0.2 0.4 40 1.1 1.9 0.6 0.2 end of duck section 41 0 1 2 1 bolt at end of rope through duck 42 0.5 2.5 0 0.3 numbered in roof at start of low crawl, remainder needs surveying *end illusion_1