*begin illusion_2 *export 42x 25 *title "East Kingsdale - Illusion Pot - upstream from bottom of entrance ladders to junction with mud crawl on R and blasted inlet ahead" *date 2013.09.07 *team Instruments Becka Lawson *team Notes Neil Pacey *instrument Becka's Distox *calibrate tape 0 ; +ve if tape was too short, -ve if too long ;from to tape compass clino remarks 1 42x 6.42 048 +0.5 2 1 2.94 034.5 -04 3 2 3.58 108.5 -19 4 3 5.14 134 -10 5 1 1.10 339 +09 6 5 3.03 351.5 +11 ; hard to read compass and clino 7 6 3.99 041 -01 8 7 5.23 057 -01 9 8 2.97 074 -01 10 9 5.60 330 -02 11 10 4.53 345.5 -01 11 top 6.64 193 +62 12 11 5.02 200 -30 11 13 2.33 056 -03 14 13 5.21 004 -02 15 14 3.40 032.5 0 16 15 4.32 344 0 17 16 5.33 070 -01 ; hard to decide if clino 0 or -01 as corrected 18 17 3.15 039 +01 19 18 0.57 117 +08 20 19 3.42 012 -0.5 21 20 3.67 054 -03 22 21 5.76 073 -02 23 22 5.04 047.5 -02 24 23 1.97 034 +04.5 25 24 3.50 070.5 +03 *data passage station left right up down ignoreall 42x - - - - numbered old station in roof, base of entrance climbs down 1 1.4 0.3 0.2 0.1 2 1.2 1 1.4 0 3 1 1.5 1 0.2 4 1.2 0.5 0.3 0.3 5 - - - - one LRUD forgotten, unclear if was 5 or 7 6 1 0.3 0.3 0 7 0.7 1 0.3 0 8 1.6 1 0.6 0.1 9 0.5 1 0.2 0.1 10 0.5 0.7 0.3 0.2 11 5 2 6 0.1 cross rift with avens top 0 0.5 3 1.5 distox shot up to top of aven; free climbed by Ian Walker in 22 Jan 2017, too tight in 2 directions, possible tight continuation above 12 2 1.5 6 1.8 13 0 2 0.3 0.1 14 0.1 1.2 0.2 0.2 15 1 0.2 0.2 0.2 16 0.5 0.5 0.3 0.3 17 0.3 0.3 0.4 0.3 top of distinctive rock "bridge" in passage 18 0.4 0.6 0.4 0.2 19 0.6 0.4 0.4 0.2 20 0 0.5 0.4 0.2 numbered 21 0.1 0.4 0.3 0.3 22 0.3 0.4 0.1 0.5 23 1 0.5 0 0.6 numbered in ceiling 24 0.1 0.4 0.1 0.5 25 0.2 0.5 0.3 0.3 numbered at junction - inlet continues ahead and orange mud passage on right (potential dig - pushed for 3 body lengths with crowbar to move jelly-like mud by Becka on 22 Jan 2017; I also checked out ahead, soon reaches two calcite "bridges" across passage which is where bang wire had been used I assume as wire led to nearly this point. Wire removed on 22 Jan 2017. Passage continues small but caveable beyond calcite bridges so more to survey) *end illusion_2