*BEGIN hammerclimb *export 0 ;gb notes ;rw disto ;green nail polish ;GB PDA ;ULSA Disto ;description - start at base of final pitch, up through 4m climb into eyehole ending at tt constriction, (theoretical connection with downstream sump area (unconfirmed) *DATE 2018.12.14 0 1 4.73 296.24 47.42 *FLAGS SPLAY 1 1a 0.18 211.57 5.71 1 1b 0.81 351.81 67.39 1 1c 0.43 73.28 -88.08 1 1d 0.49 27.99 3.16 *FLAGS NOT SPLAY 1 2 0.63 314.32 17.85 *FLAGS SPLAY 2 2a 0.45 32.49 -1.68 2 2b 0.20 216.19 -5.61 2 2c 0.38 331.91 81.45 2 2d 0.69 166.55 -83.64 *FLAGS NOT SPLAY 3 2 6.71 133.14 41.21 *FLAGS SPLAY 3 3a 2.88 121.10 28.16 3 3b 2.17 111.49 56.38 3 3c 1.30 166.37 -4.65 3 3d 0.48 44.88 -4.11 3 3e 0.37 222.07 14.50 3 3f 2.52 118.61 68.94 3 3g 3.34 9.72 -80.87 *FLAGS NOT SPLAY 4 3 3.34 181.30 83.92 *FLAGS SPLAY 4 4a 1.18 168.68 29.76 4 4b 1.04 141.90 17.24 4 4c 1.93 147.01 64.71 4 4d 0.89 220.62 22.91 4 4e 1.05 242.79 -63.18 4 4f 1.40 50.81 59.41 4 4g 2.27 3.26 72.20 4 4h 3.01 274.22 79.83 4 4i 2.51 324.56 56.94 4 4j 1.68 307.01 17.27 4 4k 1.78 293.27 -5.30 4 4l 1.50 311.46 -8.17 4 4m 2.51 303.47 -22.73 4 4n 1.45 269.76 4.72 *FLAGS NOT SPLAY 5 4 2.78 124.40 16.03 *FLAGS SPLAY 5 5a 1.08 91.37 69.53 5 5b 0.55 75.48 15.43 5 5c 0.27 86.91 -16.58 *FLAGS NOT SPLAY 6 5 1.75 156.50 11.17 *FLAGS SPLAY 6 6a 0.36 238.24 9.72 6 6b 0.32 273.15 66.08 6 6c 0.36 212.18 -47.11 6 6d 1.32 117.33 26.16 *FLAGS NOT SPLAY 7 6 1.31 115.95 26.69 *FLAGS SPLAY 7 7a 0.52 61.69 -1.93 7 7b 0.34 76.74 51.29 7 7c 2.59 321.25 -11.47 *FLAGS NOT SPLAY *data passage station left right up down 0 0.00 0.00 0.00 0.00 1 0.18 0.48 0.75 0.43 2 0.20 0.44 0.38 0.69 *data passage station left right up down 3 1.28 0.18 2.35 3.30 4 0.98 2.02 2.96 0.94 *data passage station left right up down 3 0.18 1.28 2.35 3.30 2 0.20 0.44 0.38 0.69 *data passage station left right up down 7 1.09 0.00 0.27 0.00 6 0.38 0.35 0.29 0.26 5 0.48 0.00 1.01 0.00 4 0.98 2.02 2.96 0.94 *END hammerclimb