;Cave: Avon Pot - from end of dig face to top of pitch ;Surveyors: R.Duffy(notes)/S.Lieberman(instr.) ;Date: 15/10/2015 ;Instruments: PAG + new disto *begin Av05 *export 001 002 010 *calibrate compass +6.5 *calibrate clino +0.5 *calibrate tape 0.0 *flags duplicate 002 001 01.76 123.0 -05.0 *flags not duplicate 002 003 01.95 345.0 +10.0 003 004 01.36 - UP 005 004 03.73 040.0 -15.0 005 005a 03.70 - UP 005 006 00.79 - UP 006 007 03.09 320.0 +26.0 007 008 01.71 284.0 +34.0 008 009 03.26 - UP 010 009 00.59 110.0 -14.0 *end Av05 ;st l r u d comments ;1 0.1in roof 0.2 0 1 as far as junction ;2 0.2 0.3 0.3 0.8 first LH corner from small chamber ;3 pass/1 to lip 0.8 0.8 1.1 bottom of rolled up ladder ;4 0.4 0.4 0.7 pitch edge of pitch ;5 0.3 0.3 AVEN 0.6 sitting below small aven at step up to chamber ;5a small aven ;6 0.5 0.5 AVEN 1.6 floor of pitch ;7 1 0.3 3.0 1.2 standing in hole before step up to chamber ;8 0.8 0.9 3.5PITCH 0.3 botton of rolled up ladder ;9 0.7mud slope 0.9cleft 0.7/1.7cleft 3.7 top of ladder ;10 0.3 0.2 0.7 0.9 penultimate station on survey 4