;Cave: Grind-Clean Passage to sump (from E.Wilson/T.Clayton last station) ;Surveyors: E.Wilson(intr)/T.Clayton(notes) ;Date: 29/09/2018 ;Instruments: Tom's tandem/Tom's tape ;*equate gri07.001 gri03.019 ;start of Clean Passage ;*equate gri07.008 gri08.001 *begin gri07 *export 001 008 ;*calibrate compass ;*calibrate clino ;*calibrate tape 002 001 02.37 353.0 +12.0 003 002 02.09 284.0 -05.0 004 003 03.98 342.0 -01.0 005 004 04.00 311.0 -04.0 006 005 01.10 244.0 +05.0 007 006 02.11 290.0 -03.0 008 007 03.71 014.0 +09.0 009 008 04.01 148.0 +08.0 *end gri07 ;st l r u d comments ;1 0.3 0.2 0 1.5 roof ;2 2.37 0.1 0.2 0.2 rh wall ;3 0 2 0.3 0.1 lh wall ;4 0.5 0 0.15 0.2 rh wall ;5 1 0.1 0.05 0.2 nose ;6 0.2 0.4 0.3 0.1 rock ;7 1.2 2 0 0.3 roof ;8 0 1 0.5 0.2 rh wall corner ;9