; Warning: SVX file generated by Tunnel. Do not edit. To change, edit your original files and save on top. ;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;; *begin lk13 *export 000b *export 007 *data normal from to tape compass clino ignoreall *units length metres *calibrate tape 0.0 *units compass degrees *calibrate compass 0.0 *units clino degrees *calibrate clino 0.0 ;end generated presettings ;Cave: Link Pot - Echo Echo Pot Pot continued ;Surveyors: P.Swire/H.Blyth ;Date: 31/08/04 ;Instruments: 4 ;*equate lk13.000b lk05.014 ;*equate lk13.007 lk01.034 *calibrate compass +8.00 *calibrate clino -0.50 *calibrate tape +9.50 000b 000 10.70 - UP ;made up leg from floor of pitch to head height 001 000 12.20 286.0 +22.0 ;st000 is head height on Echo Echo Pot Pot rope 000 000a 14.50 050.0 -65.0 ;st000a is 4m deep dig 001 002 13.75 132.0 -28.0 ;st002 has passage to right leading to 10m high rift 002 002p 13.00 222.0 +45.0 002p 002q 19.00 - UP 002 003 13.45 148.0 +14.0 003 004 13.90 165.0 +05.0 004 005 12.50 - DOWN 005 006 11.90 162.0 -17.0 006 007 12.00 220.0 -28.0 ;st007=Echo Pot tag *end lk13