;Cave: Ease Gill Stream Survey (part 7) ;Surveyors: R.Duffy/S.Lieberman ;Date: 19/04/07 ;Instruments: PAG *equate sf7.001 sf6.018 ;tag in rock at Pegleg Pot ent. *equate sf7.022 sf8.017;tag at Lower Kirk Cave 9 *begin sf7 *calibrate compass +6.00 *calibrate clino +2.00 *calibrate tape +0.05 001 002 07.13 343.0 -01.0 ;st001=tag in rock at Pegleg Pot 002 003 28.55 266.0 -02.0 003 004 40.34 209.6 -02.0 004 005 15.38 258.0 -02.0 ;st005 is head height at lip of Ease Gill Kirk 005 006 02.64 - DOWN 006 007 03.01 250.0 -02.0 007 008 02.42 - DOWN ;st008 is head height sitting at foot of climb 008 009 15.37 249.0 +09.5 009 010 18.10 305.0 -10.5 010 011 48.20 284.0 -02.5 011 012 50.00 218.0 -01.0 012 013 32.19 207.0 -02.5 013 014 16.44 171.0 00.0 014 015 15.69 209.0 -02.0 015 016 50.00 168.0 -01.5 016 017 19.38 187.0 00.0 017 018 30.15 209.0 -01.5 018 019 21.03 250.0 -05.0 019 019a 01.48 326.0 +14.0 ;st019a=tag on sapling 019 020 18.07 251.0 +12.5 020 020a 07.89 - DOWN ;st020a is lip of drop to lower Kirk 021 020 22.00 056.0 +29.5 021 022 07.53 003.0 +07.5 ;st022=tag in Lower Kirk Cave left side facing Kirk *end sf7