;Cave: Surface Survey from Trig Point to BPF ;Surveyors: R.Duffy/P.Grant ;Date: 27-01-97 ;Instruments: Red Rose Sunto Compass & Clino, 2x30m tape *equate ss13.030 ss01.001 *equate ss13.030 ss26.001 *begin ss13 *fix 002 65005 80893 436.96 *calibrate compass +5.50 001 002 00.88 - DOWN ;st001 is top of TRIG PT. 00.20m S of centre 002 003 60.00 101.0 -03.2 ;st002 is BM-S5344 003 004 60.00 107.0 -00.7 004 005 60.00 089.0 -06.5 005 006 60.00 093.5 -08.0 006 007 60.00 087.5 -14.3 007 008 60.00 086.5 -21.0 008 009 60.00 093.5 -16.0 009 010 60.00 087.5 -11.5 010 011 60.00 101.5 -11.5 011 012 60.00 083.0 -01.2 012 013 60.00 080.0 +04.2 ;st013 is on lane 013 014 60.00 087.5 +00.5 014 015 60.00 063.0 -02.5 015 016 60.00 060.0 -01.5 016 017 60.00 051.0 +00.5 017 018 60.00 036.0 -02.0 018 019 60.00 041.5 -03.5 019 020 60.00 052.5 -01.5 020 021 60.00 052.5 +00.5 021 022 60.00 053.5 +01.0 022 023 60.00 034.0 -04.5 023 024 60.00 033.0 -05.0 024 025 60.00 031.5 -04.0 025 026 60.00 060.5 -05.0 026 027 60.00 067.0 -05.0 027 028 36.70 083.5 -05.0 ;st028 nail at head height in footpath sign on farm lane bend 028 029 60.00 151.0 -03.0 029 030 08.85 192.5 -10.0 ;st030=BM at BPF *end ss13