;Cave: Boundary Pot - Inlet passing below Bar Stewards pitch ;Surveyors: S.Lieberman/R.Duffy/M.Shinwell ;Date: 03/05/07 ;Instruments: PAG + disto ;*equate bdy4.001 bdy3.015 ;tag in Main Passage leading to inlet below Bar Stewards ;*equate bdy4.003a bdy7a.001b ;st003a is base of pitch *begin bdy4 *export 001 *export 003a *calibrate compass +2.00 *calibrate clino +0.50 *calibrate tape 0.00 *fix 003a 67844.06 80865.91 295.43 ;foot of Bar Steward's Crawl pitch 001 002 07.78 139.0 +12.0 ;st001=tag on boulder in middle of passage 002 002a 06.59 009.0 +14.0 ;passage left wall below aven 002 002b 05.40 194.0 +25.0 ;right wall 002 003 09.06 147.0 +10.0 003 003a 02.57 235.0 -08.5 ;st003a is below Bar Stewards(BS) ;;; not needed 003a 003b 13.64 - UP ;st003b is roof of passage at BS 003 004 07.95 158.0 +02.0 004 005 03.70 119.0 +08.0 005 006 03.77 095.0 +36.0 006 007 02.92 195.0 +06.0 007 008 01.75 252.0 +07.0 ;st007 to 009 has roof oxbow tube 008 009 04.17 171.0 +08.0 009 010 00.70 - UP 010 011 02.50 159.5 -04.0 011 012 04.35 100.0 +45.0 013 012 08.67 336.0 -10.0 ;st013 is boulder choked small aven *end bdy4