;Cave: Boundary Pot - Inlet opposite passage to Fusion Cavern from new ladder area ;Surveyors: S.Lieberman/R.Duffy/M.Shinwell ;Date: 03/05/07 ;Instruments: PAG + disto ;*equate bdy5.009 bdy3.023 ;head height at bottom of new ladder pitch *begin bdy5 *export 009 *calibrate compass +2.00 *calibrate clino +0.50 *calibrate tape 0.00 001 001a 05.66 132.0 +05.0 ;st001a is choke at end of right passage 001 001b 04.82 035.0 +08.0 ;st001b is choke at end of left passage small low chamber 001 002 05.15 256.0 -17.5 ;st001 is on rib in middle of Y between passages, st002 is stal on spike high in passage roof 002 003 04.45 - DOWN 004 003 02.78 071.0 -01.0 004 005 01.40 202.0 -08.0 005 006 01.98 252.0 -39.0 ;st006=knob for sling at start of inlet 006 007 03.50 - DOWN ;st007 is floor of main passage *flags duplicate ; (Boundary Pot) looks like a tie-in to the pitch base, already covered by 022-023 in bdy3.svx 007 008 01.60 - UP ;st008 is head height 008 009 09.91 166.0 +17.5 ;st009=head height at ladder *flags not duplicate *end bdy5