;;*equate GrindEasyStRoofTube.001 lk12.033 ; Equate moved to top level file. Links Easegill to Link / Pippikin *begin GrindEasyStRoofTube *export 001 *export 022 *export 045 *title "From survey tag in Easy Street up into and along roof tube" *date 2012.03.18 *team Instruments Tom Clayton *team Notes Emma Wilson *team Tape Tom Clayton *instrument RRCPC Sightmaster Comp and Clino set (Kit A) *calibrate compass +5.0 ;Instrumets not calibrated until 03/03/2013 *calibrate clino +0.5 ;Instrumets not calibrated until 03/03/2013 *calibrate tape 0.00 ; +ve if tape was too short, -ve if too long ;from to tape compass clino remarks *flags duplicate ; (Grind - Easy Street) tie-in duplicates 017-033 in lk12 001 002 04.27 088 +02 ; 1 is old station part way down easy street - yellow tag on RH wall 002 003 03.03 074 -08 003 004 04.42 058 -05 005 004 03.18 176 -15 ; Check compass 005 006 12.28 063 -01 006 007 03.77 010 +07 007 008 04.15 045 +01 008 009 03.28 003 -01 009 010 04.64 066 -04 010 011 06.28 038 +06 011 012 02.49 123 +06 012 013 06.22 007 +05 013 014 02.66 080 -11 014 015 05.16 027 +03 015 016 04.54 079 +08 016 017 04.97 024 +03 017 018 04.59 070 +81 *flags not duplicate 018 019 03.22 299 -02 ; Stn 18 is start of new stuff, on roof of Easy St by ceiling boulder 019 020 02.08 334 -03 020 021 02.67 312 -05 021 022 01.97 001 +04 ; Stn 22 choked side passage (surveyed later on 2012.04.28) 022 023 03.13 325 -01 023 024 03.35 345 -05 024 025 04.19 005 0 025 026 02.73 318 +03 026 027 04.03 290 -02 027 028 03.68 333 +01 028 029 04.79 326 -06 030 029 03.58 193 -03 030 031 02.21 309 +04 031 032 03.71 258 -09 033 032 02.73 177 0 033 034 04.33 330 +01 034 035 02.82 043 +10 035 036 02.93 078 -01 036 037 02.82 018 +02 037 038 03.57 296 -08 038 039 05.46 348 +04 039 040 03.33 295 -04 040 041 03.50 012 -01 041 042 03.46 052 -01 042 043 02.91 315 -04 043 044 01.94 029 +01 044 045 05.93 321 +01 ;Stn 045 is at T junction 045 046 03.91 320 -01 ;Stn 046 is continuation at T junction, too tight. *data passage station left right up down ignoreall 018 1.0 2.0 0.0 4.5 ; Nobble on ceiling 019 0.1 0.8 0.3 0.2 020 0.9 0.3 0.0 0.4 021 0.3 1.2 0.5 0.0 ; floor on left 022 1.2 0.6 0.2 0.3 ; floor on boulder side passage will be tied into this station 023 0.0 1.2 0.1 0.5 024 0.0 0.8 0.4 0.4 025 1.0 0.1 0.3 0.3 026 0.7 0.2 0.2 0.8 027 0.0 1.0 0.5 0.4 028 0.3 0.4 0.1 0.6 029 0.2 1.2 0.4 0.0 030 1.5 0.4 0.0 0.3 031 1.0 1.5 0.1 0.5 032 0.1 1.5 0.4 0.2 ; end of nose on LH wall above pool 033 0.8 1.0 0.6 0.1 034 1.0 0.8 1.2 0.2 035 0.1 1.0 0.2 0.5 036 0.6 0.3 0.2 0.4 037 0.6 0.6 0.0 0.6 038 0.8 1.0 1.0 0.1 ; floor cobble 039 0.8 0.1 0.1 0.7 040 1.2 0.6 0.3 0.6 041 0.0 0.5 0.4 0.5 042 1.0 0.0 0.3 0.8 043 0.2 0.6 0.6 0.6 044 0.5 0.4 0.4 0.8 045 0.7 0.4 0.0 1.2 ; Small ~2cm mank stall above cross on ledge, opposite small passage to Grind 046 0.4 0.2 0.2 0.2 *end GrindEasyStRoofTube