;Cave: The Grind (Part 1) ;Surveyors: T.Clayton (instr.)/R.Lawson (notes) ;Date: 02/05/2011 ;Instruments: R.L. Compass/Clino/Tape30m(something missing) ;*equate gri01.055 wm.017 ;*equate gri01.000 gri02.045 *begin gri01 *export 000 *export 055 *date 2011.05.02 *calibrate compass 2.25 ; Approximate magnetic variation for 2011 *calibrate clino 0.00 *calibrate tape +0.20 *units clino percent 000 001 00.88 261.0 -55.0 ;st000=45x on a previous survey 001 002 01.20 018.0 -26.0 002 003 02.51 297.0 -04.0 003 004 03.93 312.0 -01.0 004 005 03.47 211.0 -03.0 005 006 02.52 298.0 -04.0 006 007 01.42 246.0 -29.0 007 008 06.06 332.0 -03.0 008 009 03.08 356.0 -10.0 009 010 02.23 011.0 +01.0 010 011 02.99 008.0 -13.0 011 012 03.41 330.0 +03.0 012 013 04.70 316.0 -10.0 013 014 02.37 342.0 00.0 014 015 01.15 273.0 +11.0 015 016 03.12 276.0 -21.0 016 017 03.14 281.0 -06.0 017 018 03.96 244.0 -07.0 018 019 03.77 260.0 -01.0 019 020 02.31 305.0 +03.0 020 021 03.02 167.0 -03.0 021 022 02.38 219.0 -25.0 022 023 02.86 280.0 +09.0 023 024 03.65 227.0 -10.0 024 025 04.06 315.0 -05.0 025 026 03.12 319.0 +01.0 026 027 06.03 272.0 -07.0 027 028 01.67 254.0 -03.0 028 029 04.14 301.0 -06.0 029 030 04.59 258.0 -06.0 030 031 03.27 242.0 -09.0 031 032 02.06 205.0 +12.0 032 033 05.38 265.0 -05.0 033 034 05.21 240.0 -12.0 034 035 02.61 309.0 -06.0 035 036 02.98 232.0 -15.0 ;made up leg 036 036a 05.00 155.0 00.0 ;end of made up leg 036 037 03.04 312.0 -05.0 037 038 03.09 251.0 +07.0 038 039 01.44 296.0 -29.0 039 040 01.82 271.0 -11.0 040 041 04.29 314.0 +01.0 041 042 05.98 218.0 -03.0 042 043 05.27 220.0 -02.0 043 044 02.22 261.0 -04.0 044 045 05.80 202.0 -11.0 045 046 06.40 156.0 +04.0 046 047 03.91 174.0 -08.0 047 048 01.74 220.0 -01.0 048 049 07.52 196.0 -09.0 049 050 01.11 - DOWN 050 051 03.94 184.0 -04.0 051 052 04.77 158.0 +20.0 052 053 02.04 170.0 +32.0 053 054 02.43 173.0 -04.0 ; !!! survey will need to be tied in properly !!! ;054 055 05.01 204.0 +02.0 ;Correct linking station should be on the opposite (true right wall) 054 055 04.01 204.0 +02.0 ;leg reduced by 1m to compensate for passage width. *end gri01 ; st l r u d ;comments ; 0 0.3 0 1 0.6 st0=45x on a previous survey ; 1 0 0.5 1.2 0.4 mud ; 2 0.4 0 1.4 0.2 ; 3 0.3 0.3 1.2 0.2 ; 4 0.6 0 0.3 0.4 bare rock floor ; 5 0.2 0.5 0.3 0.4 ; 6 0.3 0.4 0.3 0.4 6-7 mud + cobbles/stalactite ; 7 0.1 0.6 0.5 0.1 ; 8 0.6 0.1 0.2 0.4 7-8 bare rock/water ; 9 0.1 0.5 0.3 0.2 8-9 mud + cobbles ; 10 0.4 0.2 0.2 0.3 10-11 cobbles ; 11 0.2 1.0 0.4 0.3 11-12 cobbles + puddle ; 12 0.2 0.4 0.2 0.4 ; 13 0.1 0.4 0.3 0.3 12-13 mud ; 14 0.3 0.2 0.2 0.4 13-14 cobbles ; 15 0.1 0.6 0.1 0.6 15-19 cobbles + puddles/passage junction from right mud-filled small too tight ; 16 0 0.4 0.5 0.2 ; 17 1 0.2 0.4 0.3 ; 18 0.7 0.3 0.5 0.3 ; 19 0.2 0.9 0.3 0.3 ; 20 1.1 0.1 0.1 0.4 20-21 cobbles + water ; 21 0.1 0.4 0.1 0.5 ; 22 0.2 0.4 0.5 0.1 cobbles ; 23 0.4 0.3 0.2 0.4 23-25 bare rock ; 24 0 0.7 0.5 0.3 ; 25 0.2 0.5 0.4 0.2 ; 26 1.2 0.3 0.3 0.3 25-26 puddle ; 27 0.6 0.4 0.1 0.4 26-27 crawl over rock/water and cobbles ; 28 0.5 0.4 0.1 0.4 28-29 cobbles/stal ; 29 0.2 0.6 0.2 0.6 ; 30 0.7 0.1 0.1 0.5 cobbles - water ; 31 0.7 0.4 0.3 0.5 31-32 mostly bare rock ; 32 1.2 0.3 0.1 0.7 23-33(unreadable note??????????????????) ; 33 0.6 0.2 0 0.8 ; 34 0 0.8 0.2 0.4 ; 35 1 0.1 0.3 0.5 ; 36 ? 1.8 0.5 0.1 st is nose in L side of passage with passage junction to right to Zepplin Avenbearing 155deg. ; 37 1 0.2 0.2 0.3 cobbles ; 38 0.4 0.5 0 0.7 small passage on left ?can't read? ; 39 0.7 0 0.4 0.3 38-39 stalagmites ; 40 0.2 0.4 0.6 0.2 39-44 cobbles - water ; 41 1 0.2 0.2 1 climb over rock/floiwstoner ; 42 0.6 0 0.1 0.7 ; 43 0.3 0.5 0 0.9 ; 44 0.3 0.5 0 1 ?above another calcite climb over? ; 45 0.9 0.1 0.3 0.7 pebbles + water ; 46 0.3 0.7 0 1.3 inlet passage on left ?lp? in ceiling + scratched 46 ; 47 0.1 0.8 0.2 1.2 gravel ; 48 0.1 0.7 0.2 0.3 ; 49 0.8 0.3 0.4 1 start of low crawl small tube at roof level ; 50 0.8 0.3 1.4 0 ; 51 0.3 0.2 0.6 0 between 50-51 end of crawl ; 52 0.5 0.3 0.8 1 ; 53 0.1 0.4 0.2 1.5 52-55 mud + gravel floor ; 54 0.4 0.5 0.7 1.4 ; 55 pas pas 0 1.7 up in roof on true L wall of Wormway