;Cave: Lancaster Hole - The Grind (part 3) "Connection between Grind and Dark Side" ;Surveyors: James Carlisle(notes)/Tom Clayton(Instr.) ;Date: 05/11/11 ;Instruments: New clino/Silva prism top compass/tape (Later designated Kit A 2013.03.03 S.L.) ;*equate gri03.019 gri02.009 ;*equate gri03.001 darkside.44 *begin gri03 *export 001 *export 019 *date 2011.11.05 *calibrate compass +5.0 ;Instruments not calibrated until 2013.03.03 *calibrate clino +0.5 ;Instruments not calibrated until 2013.03.03 *calibrate tape 00.0 *units clino percent 001 002 03.01 175.0 +02.0 002 003 02.94 208.0 -01.0 003 004 02.56 236.0 -05.0 004 005 02.93 187.0 +01.0 005 006 03.26 245.0 -01.0 006 007 03.36 179.0 00.0 007 008 03.72 220.0 -01.0 008 009 02.68 194.0 -04.0 009 010 06.55 267.0 -05.0 010 011 01.86 222.0 -02.0 011 012 02.73 143.0 +05.0 012 013 05.03 205.0 -01.0 013 014 02.74 262.0 -04.0 014 015 02.73 281.0 -04.0 015 016 03.78 230.0 -04.0 016 017 05.67 298.0 -02.0 017 018 03.12 202.0 -02.0 018 019 04.04 212.0 00.0 *end gri03 ;st l r u d comments ;001 1.0 0.7 0 0 0.3 cross in ceiling marking the REAL start of the Dark Side survey ;002 0.4 0.5 0.2 0.2 ;003 1.0 0.1 0.1 0.4 ;004 0.5 0.1 0.1 0.3 ;005 0.1 0.4 0.1 0.3 side passage here was pushed for about 3m to where capping needed to progress further ;006 0.6 0.2 0 0 0.4 ;007 0 0 0.5 0.1 0.4 ;008 1.0 0.2 0 0 0.5 ;009 0.5 0.4 0 0 0.3 ;010 0.9 0.2 0.5 0.1 ;011 0.8 1.0 0.3 0.1 ;012 0.1 0.6 0.2 0.5 ;013 0.5 0.8 0 0 0.6 ;014 1.0 0.8 0 0 0.5 ;015 0.5 1.0 0 0 0.4 ;016 0.8 0.8 0 0 0.5 ;017 0.8 0 0 0.1 0.7 ;018 0.5 0.2 0.1 0.8 ;019 0.4 1.0 0 0 2.0 cross in ceiling marking the tie-in to the clean passage