;Cave: Aygill-Pitch Bypass ;Surveyors: H.St.L/M.Savage ;Date: 04/07/97pm ;Instruments: Red Rose Kit 2 *begin ay14 *export 001 *export 004 *calibrate compass +7.13 001 002 04.85 - DOWN ;st.001=st.A at top of pitch 002 002x 08.00 030.0 -07.0 002 003 05.15 208.0 +01.0 003 004 03.20 190.0 -03.0 ;opposite st.004 is left branch to pitch bypass 004 005 03.40 200.0 -02.0 005 005a 01.50 - UP 005a 005b 02.50 322.0 -17.0 005b 005c 02.50 225.0 -13.0 ;right main water goes to sump, str. ahead tight? 005 050 03.35 - UP 050 051 01.70 085.0 +15.0 051 052 01.80 - UP 052 053 02.60 120.0 +32.0 053 054 02.80 040.0 +31.0 005 006 04.20 211.0 +08.0 006 006a 04.30 118.0 +38.0 006a 006b 03.00 198.0 +10.0 ;main water enters at st.006b 006 007 08.20 225.0 -07.0 ;st.007 is inlet on right too tight 007 008 04.00 190.0 00.0 ;tight *end ay14