;Cave: Avon Pot re-survey from pitch-head to dig face + continued banging) ;Surveyors: R.Duffy/S.Lieberman ;Date: 06/10/2012 ;Instruments: PAG + disto (new) *equate Av03.001 Av02.005 *begin Av03 *export 001 *export 003a *calibrate compass +6.0 *calibrate clino 0.0 *calibrate tape 0.0 002 001 01.18 120.0 +50.0 ;st001=bolt at pitch-head 002 003 03.85 - DOWN 004 003 03.37 043.0 +29.0 004 005 03.79 191.0 -52.0 005 006 04.25 141.0 -44.0 ;007 006 01.21 005.0 +06.0 ;007 008 02.03 192.0 -15.0 ;Surveyors: R.Duffy/S.Lieberman ;Date: 06/10/2012 ;Instruments: PAG + disto (new) *calibrate compass +6.5 *calibrate clino +0.5 *calibrate tape 0.0 002a 006 02.27 005.0 +08.0 ;st006 on previous survey small knobble in floor on left of passage 002a 003a 02.02 110.0 +04.0 003a 004a 01.70 179.0 +30.0 *end Av03 ;st l r u d comments ;1 st001=bolt at pitch-head ;2 directly over pitch ;3 0.2 1.0 4.45 0 large cobble at foot of pitch ;4 0.2 0.2 0.4 1.5 head height in rift ;5 0.2 0.5 2.5 1.0 head height sitting on third step on climbs ;;;;;;;;;;;6 0.1 0.6 1.2 0 small knobble in floor on left of passage ;;;;;;;;;;;7 0.1 0.2 0.8 0.2 Start of level bit of passage at foot of slope ;;;;;;;;;;;8 0.3 0.3 ? ? end of view ;1a small knobble in floor on left of passage ;2a 0.1 0.15 2.0 1.2 Head height on Left hand corner ;3a 0.2 0.2 1.5 1.8 Head height on Right hand corner ;4a 0.1 0.0 0.6 2.7 Widest bit ahead