;Cave: Borehole - entrance to bedding at end of streamway ;Surveyors: R.Duffy/S.Lieberman ;Date: 02/11/06 ;Instruments: PAG + disto ;;;;;;;;;;;*equate B01.001 B1.001 ;st001=ent tag *equate b01.021 b02.001 ;is roof of passage at entrance to small aven *equate b01.007a b04.017 ;tag at foot of ent. pit *equate b01.015 b06.001 ;st015=tag on nose at junction *begin b01 *export 007a *export 001 *export 021 *export 015 *calibrate compass +3.00 *calibrate clino -0.50 *calibrate tape 0.00 *fix 001 67703.70 80708.48 322.56 ;ev.sf3.003 001 002 03.21 171.0 -12.0 ;st001=ent.tag 002 003 02.07 - DOWN ;short climb down 003 004 02.22 121.0 -01.0 004 005 03.50 199.0 -20.0 005 006 04.34 130.0 -17.0 ;st006 is head at level with lip of pit climb 006 007 02.24 - DOWN ;st007 is head height lying at bottom of pit 007 007a 00.84 072.0 +06.0 ;st007a is tag in thread at start of upstream passage, unsurveyed 007 008 02.58 021.0 -06.0 ;st008 is lying with head at edge of large boulder above canal 008 009 03.06 317.0 -02.0 ;1 metre deep canal to boulders/cobbles at st009 with boulder filled aven to left 009 010 06.02 009.0 -04.0 010 011 04.38 033.0 +03.0 011 012 04.33 020.0 00.0 ;st012 has small tube at roof level to right too tight 012 013 02.38 333.0 00.0 013 014 00.70 021.0 -02.0 ;st014 is head height sitting at foot of aven 3.5 m tall to too samll inlet 014 015 04.66 034.0 -01.0 ;st015=tag on nose at junction. Passage to right crawled up by S.L. for long way needs skinny surveyors. Deep water at junction. 015 016 00.10 - UP ;station raised to see over bends 016 017 02.07 309.0 -01.0 017 018 03.06 332.0 +01.0 018 019 01.66 282.0 +01.0 ;st020 has inlet to left, station is head height crouched in middle of passge at junc. 019 020 04.20 335.0 -01.0 020 021 02.52 280.0 +03.0 ;st021 is roof of passage at entrance to small aven on right, tag in aven 30cm above lip as marker *end b01