;Cave: County Pot ;Surveyors: R.Duffy/P.Swire/A.Clarke/D.Davis ;Date: 30/12/00 ;Instruments: PAG *equate cy12.001 cy10.041 ;;*equate cy12.041 maw1.026 ;not needed as cy12a.001 does the job ;equate cy12.001 cy2a.016 ;*equate cy12.017 sylv1.syl2.425 *equate cy12.002 cy15.001 *equate cy12.038 cy12a.004 ;bottom of climb up to passage to Ease Gill Aven *equate cy12.017 cy10c.041 ;Platypus junc. tag *equate cy12.025 cy12b.002 ;downstream end of Molluscan Hall before slope to stream *begin cy12 *export 025 *export 002 *export 001 *export 038 *export 017 *calibrate compass +5.00 *fix 001 67403.14 80673.44 259.51 ;aadw.cy12.001 *fix 017 67286.07 80677.75 251.46 ;aadw.cy12.017 tag at Dismal Junc. 001 002 01.40 333.0 -20.0 ;st001=tag left of platypus nose 002 003 07.20 271.0 -09.0 ;st002 is end of Platypus Nose 003 004 07.10 250.0 -01.0 ;st1 to 4 is in stream with dry oxbow to left 004 005 16.80 254.0 00.0 005 006 12.57 281.0 -05.0 006 007 06.80 318.0 +07.0 007 008 05.35 282.0 00.0 008 009 06.10 292.0 -02.0 ;st009 has small oxbow to left 009 010 09.95 272.0 +02.0 ;st010 has inlet to left? 010 011 06.80 236.0 +03.0 ;st011 has inlet to left and oxbow to left to st12 011 012 16.60 284.0 -01.0 012 013 06.40 214.0 +05.0 ;st013 has inlet to left 174deg for 7m? 013 014 05.60 264.0 -12.0 014 015 10.30 308.0 -01.0 015 016 12.60 321.0 -03.0 016 017 05.60 252.0 00.0 ;st017=tag in roof on corner of Clough's Passage 017 018 07.80 290.0 00.0 ;st018 on dryish ledge right of passage 018 019 09.90 284.0 +01.0 ;st019 is boulder top as leaving water 019 020 01.10 - UP 020 021 01.70 347.0 -16.0 ;st021=UP70 top of obvious large boulder in Molluscan Hall start(A.Halls st.A for Dismal Bypass) 021 022 12.60 311.0 +06.0 022 023 09.40 326.0 -07.0 023 024 10.50 289.0 00.0 024 025 07.20 359.0 -31.0 ;gravelly drop back to stream from left hand side of M.H. 025 026 13.90 333.0 +01.0 ;st026 on ledge left out of stream 026 027 07.40 339.0 +09.0 ;st027 is start of gravelly bedding crawl 027 028 13.60 299.0 00.0 028 029 01.00 293.0 -21.0 ;st029 is drop out of crawl 029 030 03.90 209.0 00.0 030 031 00.80 - UP 031 032 02.70 253.0 -02.0 032 033 01.50 199.0 -08.0 033 034 02.30 251.0 +41.0 034 035 01.75 - UP ;st29 to 35 is through boulder chambers 035 036 06.90 281.0 +23.0 ;st035 is top of glutinous mud ledge 036 037 09.30 276.0 00.0 ;st037 has trench below? 037 038 08.10 304.0 00.0 ;038 039 06.90 159.0 +05.0 ;st039 has passage off to right to (Snail????) ;039 040 03.20 - UP ;between 40 & 41 is small passage to left ;040 041 11.20 143.0 +03.0 ;st041=bottom of rope Ease Gill Aven *end cy12