;Cave: County Pot - Confusion Corner to Spout Hall and return thro Bypass ;Surveyors: R.Duffy/A.Whitney ;Date: 01/04/04 ;Instruments: PAG *equate cy3c.001 cy3.33 *equate cy3c.012 cy3d.001 ;dry bypass down to PJ *begin cy3c *export 001 *export 012 *calibrate compass +5.00 *calibrate clino +0.50 *calibrate tape 00.0 001 002 03.85 337.0 -26.0 ;st001 is top downstream edge of Pinnacle at end of Snake at Confusion Corner 002 003 07.48 344.0 -06.0 ;st002 is edge of Confusion Corner head height 003 004 03.14 040.0 -14.0 004 005 03.62 327.0 -11.0 005 006 02.87 295.0 -01.0 006 007 03.49 013.0 +05.0 ;st007 is head height with back in side passage unsurveyed 007 007a 02.20 143.0 -30.0 007a 007b 02.40 120.0 +22.0 ;foot of climb to inlet above 007b 007c 03.00 - UP ;inlet very tight 007 008 03.94 271.0 -09.0 ;st008=tag at Spout/Trident junction 008 009 00.30 - DOWN 009 010 01.70 246.0 -16.0 010 011 03.92 300.0 -10.0 ;st011 is head height over drop to Spout Hall 011 012 02.38 - DOWN 013 012 05.74 046.0 -26.0 013 014 05.63 182.0 +31.0 014 015 01.70 - UP ;st015 is head height standing in loose chamber of bypass 015 016 05.58 129.0 +22.0 ;st016 is head height at lip of abandoned stream passage 016 017 08.56 148.0 +04.0 017 018 02.15 085.0 +17.0 018 019 03.74 053.0 +05.0 019 001 05.73 143.0 -05.0 ;pinnacle *end cy3c