;Cave: Bat Cave - Ease Gill ;Surveyors: A.Whitney/I.Eeles ;Date: 21/04/02 ;Instruments: 1 ;*equate bat.000 geh.001 ;only needed for positioning *begin bat *calibrate compass +3.00 *fix 001 67576.64 80586.24 318.22 ;ev.sf3.014b *fix 008m 67599.53 80571.96 317.74 ;edge of sheet 3c *fix 120 67600.10 80548.90 319.68 ;edge of sheet 3c ;000 001 11.16 135.0 +25.0 ;st001 is Bat Cave entrance 001 002 02.02 083.0 -53.0 002 003 01.75 137.0 +04.0 003 004 01.23 115.0 +05.0 004 005 01.28 168.0 +03.0 005 006 01.17 102.0 +16.0 006 007 01.44 153.0 +05.0 007 008 02.41 133.0 +10.0 ;st008 is Y junc. ;Surveyors: R.Duffy/S.Lieberman/A.Whitney ;Date: 06/04/02 ;Instruments: PAG *calibrate compass +5.00 *calibrate clino +00.5 *calibrate tape +1.00 008 008a 01.81 338.0 -08.0 ;bat cave left hand branch from Y juction 008a 008b 02.89 082.0 -12.0 008b 008c 02.58 148.0 +01.0 008c 008d 02.50 093.0 +13.0 008d 008e 02.18 158.0 +01.0 008e 008f 03.58 098.0 +11.0 008f 008g 02.80 204.0 -03.0 008g 008h 03.94 124.0 +05.0 008h 008i 03.66 139.0 -10.0 008i 008j 03.82 128.0 +13.0 008j 008k 02.12 168.0 +04.0 008k 008l 02.44 133.0 +09.0 008l 008m 02.54 043.0 -33.0 008m 008n 03.69 089.0 00.0 ;beyond st008n too tight passage 008m 008o 05.58 183.0 +11.0 ;st008o is stal alcove in chamber ;Surveyors: A.Whitney/R.Duffy ;Date: 12/08/02 ;Instruments: PAG *calibrate compass +5.00 *calibrate tape +1.00 008 102 03.57 146.5 -18.0 ;st008 is Y junc. right hand branch 102 103 01.95 142.0 -03.5 103 104 02.00 162.5 +20.0 104 105 01.00 130.0 -06.5 105 106 03.08 193.5 +08.0 106 107 01.90 - UP 107 108 02.30 235.0 +03.0 ;inlet between stations on left too tight 108 109 02.88 185.0 -04.5 109 110 02.95 156.0 +05.0 110 111 03.49 189.0 00.0 111 112 04.63 159.0 +05.0 112 113 02.27 175.0 +06.0 113 114 02.60 102.0 00.0 114 115 04.26 116.0 +01.0 115 116 04.80 177.0 +07.0 ;st115 has inlet on left too tight 116 117 02.36 083.5 +10.0 117 118 05.37 162.5 -04.5 118 119 03.55 126.0 +06.5 119 120 05.98 164.0 +04.0 120 121 02.32 184.0 +06.5 121 122 03.55 144.0 +10.0 ;st121 is upstream side of jammed/calcited boulder standing and at head height 122 123 02.70 245.0 +16.0 123 124 02.70 - UP ;bottom lip of water spout from waterfall 122 122a 03.30 137.0 +05.0 ;passage passing waterfall 122a 122b 04.87 082.0 +07.0 ;mid-way between stations is passage to right steeply up to small chamber, loose, with higher chamber with cobble roof, choked 122b 122c 03.70 146.0 +10.0 ;start of too tight choked rift in small chamber *end bat