;Cave: Rebar Pot ;Surveyors: R.Duffy/S.Lieberman ;Date: 17/05/09 ;Instruments: Disto + MKO *begin reb *calibrate compass 0.00 *calibrate clino 0.00 *calibrate tape 0.00 *fix 001 67829.61 80798.36 331.36 ;sf2a.001 tag Rebar Pot on boulder near pot 002 001 03.67 197.0 -14.0 ;st001=tag in boulder near pot 003 002 03.52 - UP ;st003 is base of climb down pot with rebar 003 004 01.64 305.0 -41.0 005 004 01.49 051.0 +58.0 ;st005 is in bedding below tight slot 005 006 02.73 161.0 00.0 ;st006 is on right wall in lower bedding 006 007 02.03 097.0 -04.0 ;st007 is end of cobbled bedding (needs digging?) ;surface shakehole ;001 001a 00.71 - UP ;raise station ;001a 001b 02.10 189.0 -30.0 ;001a 001c 06.85 277.0 -47.0 ;Southern end of hole ;001a 001d 06.39 323.0 -18.0 ;Northern end of hole *end reb