;Cave: Main drain from MB5 to UP18 (Assembly Hall to Holbeck Junction) ;Date: Md3 27/07/96 afternoon & 12/10/96 afternoon ;Surveyors: Dalek,R.Duffy & R.Duffy/R.Scott ;Instruments: Club Silva Compass & Clino *equate md3.027 md4.001 ;*equate md3.001 md2.060 ;not needed now ;;;;;;;;*equate md3.001 md2a.001 ;not needed now *equate md3.027 md3i.001 *equate md3.006 md3b.001 *equate md3.001 md3c.001 ;bolt hole at bottom of climb *equate md3.001 md3d.001 ;bolt hole at bottom of climb *begin md3 *calibrate compass +5.27 *fix 001 67724.87 80939.64 276.59 ;bolt hole at bottom of pitch, Assembly Hall *fix 014 67600.32 80956.55 268.04 ;edge of sheet 3c 001 001a 05.90 004.0 -37.0 ;st.001a=MB5 surveyed 12/10/96 RD & RS 001 002 06.61 015.5 -21.5 ;STmd3.001=assembly hall bottom of pitch, bolt hole 002 003 12.76 278.0 -08.5 003 004 03.07 246.5 -01.5 004 005 05.50 286.5 +03.5 005 006 06.95 309.0 -16.0 ;bolt in stal boss at drop to Thack. Pass 006 007 20.89 315.0 -01.0 007 008 15.46 256.0 -01.5 008 009 16.17 283.5 00.0 009 010 05.90 330.0 00.0 ;head height R wall/Passage on L 010 011 04.47 304.5 00.0 ;head height L wall/Passage on L 011 012 18.81 321.5 -00.5 012 013 24.03 249.0 -00.5 ;sitting on ledge/dig in L wall 013 014 17.89 229.0 -01.0 014 015 06.70 306.0 -05.0 015 016 17.52 258.0 -01.0 ;bolt hole/ entrance to stal grille(? cal.window) 016 017 07.19 249.0 +08.0 017 018 10.91 194.5 +03.5 018 019 28.45 248.0 -01.5 ;bolt hole in roof at step down 019 020 06.67 255.0 -08.0 020 021 04.27 190.0 -09.0 021 022 11.73 256.0 +01.0 022 023 11.68 275.0 +00.5 023 024 15.43 227.5 +02.0 024 025 05.17 183.5 -00.5 025 026 11.10 235.0 +01.0 026 027 04.19 196.5 +01.5 ;md3.027=UP18 *end md3