;Cave: survey of Stop Pot from MB3 tag ;Surveyors: R.Duffy/A.Whitney/D.Thompson ;Date: 25/05/03 ;Instruments: PAG *equate stop.007 l5.007 *begin stop *export 007 *calibrate compass +5.00 *calibrate clino +0.50 ;legs 001 to 005 are up slope to ladder, not needed except for drawing up ;001 002 00.70 - UP ;st001=tag at MB3 ;002 003 20.05 250.0 +25.0 ;003 004 05.54 292.0 +44.0 ;004 005 09.49 211.0 +08.0 ;st005 is head height against wall vertically below third junction on ladder 005 006 03.80 - UP 006 007 04.55 251.0 +56.0 ;st007 is 1m above Slugs end station ;007 008 09.94 267.0 00.0 ;leg not needed ;survey around Stop Pot upper chamber 005 005a 05.07 312.0 -21.0 005a 005b 09.05 047.0 +07.0 005b 005c 11.60 060.0 -07.0 005c 005d 11.90 205.0 +03.0 005d 005 08.93 247.0 +14.5 *end stop