;Cave: County Pot - Trident - from tag at bottom of Guillotine Aven (Final Chamber) to tag 9a at bottom of Bedsted Chamber ;Surveyors: R.Duffy/A.Whitney/S.Lieberman ;Date: 10/02/12 ;Instruments: PAG *equate trident20.001 trident12.004 ;joined at Final Chamber(bottom of Guil.Aven) *equate trident20.001 trident19.005c ;joined at Final Chamber(bottom of Guil.Aven) *equate trident20.001 trident21.001 ;joined at Final Chamber(bottom of Guil.Aven) *equate trident20.002h trident13.002 ;tag in bottom of Bedstead Chamber *equate trident20.002h trident19.001 ;tag in bottom of Bedstead Chamber *equate trident20.002h trident22a.006 ;tag in bottom of Bedstead Chamber *equate trident20.002ci trident20a.001 ;tag into aven on right facing downstream *begin trident20 *export 001 *export 002ci *export 002h *calibrate compass +4.50 *calibrate clino 00.0 *calibrate tape +1.00 001 002 05.89 142.0 +35.0 ;st001=tag 9a at bottom of Guillotine Aven in Final chamber 002 002a 04.11 000.0 +11.5 ;st002a is on lip of passage on left facing up slope of chamber at head height 002a 002b 04.39 328.0 -23.0 ;heading downstream st002b is opposite an eyehole through to wet Final Chamber 002b 002c 04.14 350.0 -12.0 002c 002ci 02.36 - UP ;st002ci=tag for survey into aven on right facing downstream 002c 002d 01.80 000.0 +05.0 002d 002e 02.95 270.0 -42.0 002e 002ei 01.87 - DOWN 002ei 002eii 01.55 289.0 +04.0 ;st002eii is 10cm from roof of stream passage below this survey 002e 002f 02.80 007.0 +49.0 002f 002g 06.03 310.5 -13.0 002g 002h 05.02 240.0 -06.5 ;st002h=tag in Bedstead Chamber *end trident20