;Cave: Trident - Upstream of Final Chamber ;Surveyors: R.Duffy/A.Whitney ;Date: 07/01/03 ;Instruments: PAG *equate trident21.001 trident12.004 ;joined to Downstream loop Key Passage *equate trident21.001 trident19.005c ;joined to Downstream loop Key Passage *equate trident21.001 trident20.001 ;joined to Downstream loop Key Passage *equate trident21.002 trident27a.004 ;tag below climb in final chamber *begin trident21 *export 002 *export 001 *calibrate compass +4.50 *calibrate clino +1.00 001 002 05.82 128.0 +18.0 ;st001=tag9a in Final Chamber 002 003 03.47 217.0 +33.0 ;st002=tag at bottom of climb up to passage and also above sink in floor 003 003a 02.94 208.0 +31.0 ;st003a is choke with choke to left and right 003 004 04.94 132.5 +05.0 ;low bedding to right and left, choked 004 005 02.00 132.0 +10.0 ;st005 is at point where bedding is too tight *end trident21