;Cave: Limerick Passage - part 4 -right hand branch right steamway ;Surveyors: R.Duffy/S.Lieberman ;Date: 03/05/08 ;Instruments: MKO + disto *equate t06biii.001 t06bii.003d ;st001=cable tie *equate t06biii.001 t04.202 *begin t06biii *export 001 *calibrate compass +1.00 *calibrate clino +0.50 *calibrate tape 0.00 001 002 08.90 141.0 +06.0 ;st001=cable tie in parallel streamway 002 003 03.48 172.0 +05.0 ;lower stream trench runs below to st005 003 004 06.61 130.0 +02.0 004 005 04.62 180.0 +06.0 005 006 03.67 129.0 +03.0 ;st110A on wall at st005 ;right hand passage at cobbled junction 006 006a 02.28 198.0 -02.0 006a 006b 02.48 172.0 +10.0 006b 006bi 01.60 - UP ;small aven draughting up 006b 006c 01.75 198.0 +04.0 ;left hand passage at cobbled junction 006 007 06.71 117.0 +03.0 007 007a 03.75 358.0 00.0 ;passage cont. too small needs digging 008 007 02.46 285.0 -70.0 008 008a 03.09 170.0 +09.0 ;cobble choke to right half way up aven 008 008b 02.77 111.0 +67.0 ;top of aven *end t06biii