; Locn: Leck Fell ; Cave: Ireby Fell Cavern ; Connection between True Grit and True Mud, through mud sump / dig *begin neinlet9 *export 111x 7 8 *title "North East Inlet 9 - True Mud / True Grit connection" *date 2010.10.09 *team Insts Becka Lawson *team Notes Neil Pacey *instrument Compass and Clino - Becka's tandem compass-clino and Becka's tape read from 0cm *calibrate tape 0 ; +ve if tape was too short, -ve if too long ;from to tape compass clino remarks 1 111x 7.58 129 +01 2 1 4.96 131 0 3 2 5.11 107 +07 4 3 3.23 082 +01 5 4 4.23 107 +04 6 5 3.68 137 +02 7 6 3.06 132 -11 8 7 8.04 074 -02 *data passage station left right up down ignoreall 111x 2 2 0.2 1.5 numbered station from previous NE Inlet survey, in ceiling, start of dig 1 1 0.3 0.2 0.5 2 1.2 0.2 0.3 0.4 down is less than a metre, nought point something 3 0.2 1 0.4 0.2 down unclear but less than a metre 4 0.2 1 0 0.2 down unclear but less than a metre 5 0.1 1.1 0.4 0.2 I think this one is numbered on ceiling, in middle of lowest section of dig so beyond dig breakthrough from NE Inlet side but before final low section into True Grit - but why then is up 0.4? Written down wrong? 6 0.1 1 0.2 0.1 I think this is just past lowest point on True Mud side, so at point where can start crawling again rather than flat out 7 1.1 0 0.5 0.5 I think this is beyond low point where dig started on True Mud side - I think this is numbered 8 1.1 0.4 0.6 0.3 at corner on r wall near stal, bearing of 170 forward into passage and then it bends to right *end neinlet9