*begin ljmainstreamway1 *export 74x 30 *title "Survey from numbered Becka Julian station just upstream of canal at small inlet, then up inlet to sump then up main streamway to mud inlet to bolt" *date 2013.10.12 *team Instruments Dave Ottewell *team Tape Helen Blyth *team Notes Becka Lawson *instrument Becka's Distox *calibrate tape 0.00 ; +ve if tape was too short, -ve if too long ;follow up trip to check dodgy readings down to sump at start from station 74x on ; *team Instruments Edvin Deadman ; *team Notes Becka Lawson ; *instrument Becka's Distox ; *calibrate tape 0.00 ; +ve if tape was too short, -ve if too long ;from to tape compass clino remarks ; 76x 1a 4.54 246 +02 ; 1 is old station ; 1a 2a 3.03 254 -08 ; 2 is old station ; 2a 3a 2.91 274 +08 3 4a 2.74 213 -02 4a 5a 1.62 154 +04 5a 6a 5.59 224 -01 6a 7a 4.10 277 0 ; 7 is old station 7a 8a 2.14 342 -05 ; 8 is old station ;from to tape compass clino remarks A 74x 2.33 256 -19 74x 76x 8.73 252 -01 ; note old station 76 has both 75 and 76 numbered on it! 76x 1 4.53 246 +01.5 ; note old station 76 has both 75 and 76 numbered on it! 1 2 3.00 254 -07.5 2 3 2.96 274 +07.5 3 4 2.35 294.5 -14 ; 3 5 1.96 219 -01 ; changed from 2.96 to 1.96m on tape after downloading Distox 25/10/13 ; subsequently replaced these legs (from 3 - 8) by a resurvey by Edvin and Becka on 14/12/13 as something very wrong here - maybe Dave held the Distox near his battery pack? Looks OK with new legs ; 5 6 2.26 163 0 ; 6 7 5.70 160.5 +04 ; 8 7 4.16 042 +14 ; Inlet felt flat but Distox download confirms clino was +14 Check! Hmm, actually I've reversed the leg (written 7 to 8, changed to 8 to 7) based on my memory and the old survey ... I was doing notes ahead of Dave and Helen and I couldn't see which way they were shooting. This would at least make the clino readings more sensible; Distox shot two similar legs so unlikely to be wrong there ; 9 8 2.09 336 -03 A 10 12.57 126 -03 10 11 12.05 089 +00.5 11 12 12.99 124 +01 12 13 7.84 093 0 13 14 1.69 136.5 +05 14 15 6.86 156 -02 15 16 6.39 093.5 +02 16 17 4.62 164.5 -02 17 18 8.56 106.5 +00.5 18 19 8.49 138 -02 19 20 7.58 053 +02 20 21 4.28 129 +02 21 22 3.13 174 +00.5 22 23 10.97 121 -03 23 24 19.28 147 -01 24 25 5.68 137 +07 25 26 3.88 202.5 +02 26 27 5.66 089 +05.5 27 28 5.49 136.5 -02 28 29 7.75 103.5 0 29 30 3.92 164 +12 *flags duplicate 30 31 2.61 168 +39 30 32 3.30 054 -02 ;from to tape compass clino remarks *data passage station left right up down ignoreall A 2.5 1.3 0 1.8 presumably old station, liquid paper in roof of main passage 74x - - - - old, numbered station at junction of main passage with inlet 76x - - - - old, numbered station in inlet - note this station has both 75 and 76 numbered on it! 1 1 0.75 0 0.75 ceiling 2 0 0.5 0.5 0.2 l wall 3 0.8 0.6 0 0.6 ceiling before tiny oxbow 4 - - - - back of oxbow, splay ; 5 0.5 0.5 0 0.5 ceiling ; 6 0.5 1 0 0.5 ceiling ; 7 0.1 0.6 0.5 0.2 l wall ; 8 0 0.5 0 0.5 ; 9 0.3 0.4 0 0.3 sump 4a 0.5 0.5 0 0.5 ceiling 5a 0.5 1 0 0.5 ceiling 6a 0.1 0.6 0.5 0.2 l wall 7a 0 0.5 0 0.5 8a 0.3 0.4 0 0.3 sump 10 1.6 0 1.2 1 r wall 11 0 1.3 1.8 1.2 l wall 12 1 0 2.5 1.5 r wall 13 0 1 2.5 1.6 l wall 14 1 0 2.5 1.6 r wall 15 1 0 3 1.6 r wall 16 0 1 3 1.6 l wall 17 1.5 0 3 1.5 r wall 18 0 1 3.5 1.5 l wall, numbered 18 19 2 0 4 1.2 r wall 20 0 1.5 5 1.5 l wall at corner 21 0 1 4 1.5 l wall 22 1.5 0 4 1.6 r wall 23 1.5 0 4.5 0.6 r wall 24 0 2.5 5 0.4 l wall 25 0 1 5.5 0.8 l wall 26 1.7 0 5 1 r wall 27 0 1 5 1.4 l wall 28 0.7 0 5 1.4 r wall 29 0 1 5 1.6 l wall 30 2 0 3.5 2 high on r wall, on edge, numbered 31 0.5 0 3 2 bolt for handline to what I think is Mud Inlet 32 - - - - shot down main passage, I think to R wall *end ljmainstreamway1