;Cave: MarbleStepsPot ;Surveyors: Dave Ramsay/Richard Bendall ;Date: 23/06/11 ;Instruments: Red Rose Suunto Compass & Clino kit 2, 30m tape *begin Flyover1 *export 001 *date 2011.06.23 ;commented out by Simon Cornhill 2019.04.27 as it is superseded by *declination auto in leckfell.svx ;*calibrate compass ;*calibrate declination +2.49 ;RGB calculated mag decl from http://www.ngdc.noaa.gov/geomagmodels/struts/calcDeclination ;54.188n 2.492w 2011.06.23 ;stn to stn tape comp clino 001 002 11.28 171 +63 ;Stn001=Sidewinder1.007 002 003 5.00 128 +35 ;into continuing tight rift. 002 004 4.58 231 0 004 005 3.60 230 +1 005 006 2.40 256 -3 006 007 2.07 244 0 008 007 1.30 020 -12 009 008 0.70 086 +2 009 010 5.64 191 +3 010 011 5.76 148 -1.5 011 012 4.30 200 +4 012 013 5.23 149 -3 013 014 5.60 - Down 012 015 5.30 200 +2 015 016 3.00 155 0 016 017 3.00 190 0 009 018 5.92 326 +3 018 019 4.84 308 +12 019 020 5.26 309 +8 020 021 4.40 315 +32 *data passage station left right up down ignoreall 001 3.0 4.0 12.0 1.0 ;smallprojection midway between Elliot & Eco hanger 002 0.6 1.2 0.5 5.0 ;Knot of Y-hang 003 0.2 0.2 1.5 1.5 ;leg up thin rift 004 1.6 0.1 0.3 0.2 ;RH Wall 005 0.4 1.2 0.3 0.1 ;floor LH side 006 0.0 0.8 0.2 0.3 ;Tight section of bedding 007 0.4 0.4 0.4 0.1 ;Bedding 008 0.7 0.7 0.3 0.0 ;Exit tight stuff 009 0.3 0.9 0.4 0.3 ;Junction 010 1.2 2.0 0.0 0.6 ;Roof edge of pit 011 2.0 0.5 0.3 0.1 ;Small stall at entrance to bedding 012 2.0 1.0 0.4 0.5 ;End of bedding 013 0.5 0.6 1.1 5.6 ;Above pit 014 0.3 0.3 5.0 0.0 ;Down to ledge-big drop below 015 0.1 0.4 0.1 0.3 016 0.1 0.4 0.1 0.3 017 0.9 0.6 0.1 0.3 018 1.9 0.1 0.6 1.6 ;LH wall 019 0.1 0.5 0.7 1.0 ;RH wall 020 0.4 0.0 0.5 0.9 ;RH wall 021 1.0 0.0 1.0 0.5 ;up choked rift *end Flyover1