*begin BrunoKranskiesBoxheadConnection *export 19x 50 *title "Dug connection from Stn 19 of old survey in Notts II until decorated chamber in Boxhead / Lost Johns" *date 2011.12.28 *team Instruments Becka Lawson except for Stns 35 till 42 which were Julian Todd *team Notes Emma Wilson *team Tape Andy Chapman until stn 34 *instrument CHECK but probably RRCPC Compass and Clino Set 2 ;commented out by Simon Cornhill 2019.04.27 as it is superseded by *declination auto in leckfell.svx ;*calibrate declination +2.44 ;RGB calculated mag decl from http://www.ngdc.noaa.gov/geomagmodels/struts/calcDeclination ;54.1994n 2.5124w 2011.12.28 *calibrate tape 0.20 ; +ve if tape was too short, -ve if too long ; tape snapped during station 33 to 34 reading (probably) so calibtration changed last 10cm lost so after 34 calibration changed, ;from to tape compass clino remarks 19x 1 1.46 153 -42 ; 19x old station 1 2 1.83 115 -10 2 3 3.68 082 +02 3 4 2.69 115 +23 4 5 2.69 096 +19 5 6 2.55 144 +36 6 7 2.35 126 +17 7 8 2.19 106 +47 8 9 1.91 222 +29 9 10 2.99 108 +32 10 11 1.83 170 +23 11 12 1.36 118 +41 12 13 1.68 277 +74 13 14 1.95 203 +28 14 15 1.53 - up 15 16 1.47 140 +13 16 17 2.55 124 +33 17 18 2.42 - up 18 19 2.27 007 +17 19 20 1.21 273 +12 20 21 1.87 221 +62 21 22 1.21 244 +29 22 23 1.55 232 +76 23 24 2.24 332 +04 24 25 2.10 020 +34 25 26 1.24 131 +05 26 27 1.50 205 -25 27 28 2.58 152 -15 28 29 3.45 146 +02 29 30 0.53 - down 30 31 2.64 142 -22 31 32 1.33 162 +46 32 33 3.25 085 +21 33 34 3.80 055 +32 *calibrate tape +0.30 ; due to snapped tape lost 10cm 34 35 3.40 180 -61 35 36 2.98 176 0 36 37 1.47 123 +50 37 38 1.96 130 -62 38 39 3.72 146 -21 39 40 3.81 093 -06 40 41 4.35 160 +01 41 42 3.47 122 -10 43 42 4.26 254 -68 43 44 2.25 216 +04 45 44 1.43 173 -36 45 46 3.05 114 +44 47 46 3.40 120 -49 48 47 1.89 241 -70 49 48 1.48 317 -31 50 49 2.15 250 0 *data passage station left right up down ignoreall 1 1 0.2 1.5 0.4 2 0.6 0 0.3 0.2 3 0.3 0.3 0.2 0.2 4 0.2 0.3 0.8 0.5 5 0.6 0.3 1 0.3 6 0.2 0.5 0.3 0.3 7 0 0.6 0 0.3 8 0.3 0.3 0.3 1.2 9 0.5 0 0.4 0.5 10 0 0.5 0.3 0.2 11 0.2 0.4 1 0 12 0.3 0.5 1.8 0.3 ; Station 12 is base of scafold climb 13 0.7 0.1 0.4 1.5 14 0.3 0.2 2 0.4 ; Station 14 is base of scafold climb 15 0.2 0.4 1.3 1.5 16 0.2 0.1 0.4 0.4 17 0.2 0.2 3.2 0 18 0.5 0.5 1.2 2.8 19 0.5 0 2 0.5 ; Below big scafolded boulder 20 0.5 0.5 2 0.3 21 0.1 0.7 0.8 0.5 22 0.5 0.1 0.3 1.5 23 0.4 0.3 2.5 0.4 ; Just before C1.5 up scafold planks 24 0 0.6 0.2 0.4 25 0.9 0 1 0.5 ; Up reading is up to a scafolded roof 26 0.3 1.2 0.5 0.2 ; On bag 27 0.6 0.1 0.4 0 28 0.6 0 0.5 0.2 29 0.1 0.5 0.3 0.4 ; On scaff ceiling 31 0.5 0.4 1.6 0.1 32 0.5 0 0.5 0.4 33 1 0.5 1.5 1 34 2.5 0.6 0.5 1.9 35 0.5 0.6 1.5 0 36 0.5 0 1 1 37 0.5 0.4 1 2 ; Bolt on scaff, up reading through boulders 38 0.6 0.4 0.5 0 39 0.6 0.4 1.6 0.2 40 0.4 0.8 0.6 0.2 41 0.5 0.5 0 0.5 42 0.5 0.5 0.4 0 43 0.5 1.5 0 1.5 44 0.2 1.5 0 0.4 45 0.2 0.3 1.2 0.6 46 0.4 0.3 0.5 1 47 0 0.3 0.2 0.5 48 0 0.3 0.4 1 49 0.4 0 1 1.3 50 0.4 2 0 0.5 ; 50 is numbered on left ceiling above flowstone, beyond final thrutch *end BrunoKranskiesBoxheadConnection