*begin LazloStrog2 *export 1 7 29 *title "Count Lazlo Stroganoff from end of large passage to base of 24m pitch up" *date 2010.09.12 *team Instruments Dave Ramsay *team Notes Ruth MacDonald *instrument RRCPC set ?2? and 30m yellow tape *calibrate tape 0 ; +ve if tape was too short, -ve if too long ;from to tape compass clino remarks 1 2 1.58 - down 2 3 1.53 171 +01 3 4 1.09 - down 4 5 1.66 157 -36 5 6 0.48 - down 6 7 4.61 125 +20 7 8 4.34 017 -23 8 9 4.75 355 -60 9 10 2.25 105 -40 10 11 1.15 075 -55 8 12 1.79 062 -31 ; CHECK - compass seems to be written as 0.62, not sure what this means 12 13 3.54 100 -35 13 14 4.34 180 0 14 15 3.49 - up 15 16 2.01 245 +08 ; notes say station 15 to 10 but then no station connects to 16 so I assume must be station 16 16 17 3.84 134 +33 17 18 4.19 152 +14 18 19 1.48 198 +27 19 20 2.24 095 +52 20 21 1.73 135 +45 21 22 3.05 090 0 22 23 2.28 138 -42 23 24 4.97 175 -31 24 25 3.11 075 +08 25 26 4.67 201 -33 26 27 2.73 005 -35 25 28 4.53 190 +15 28 29 3.59 078 +47 *data passage station left right up down ignoreall 1 0.3 0.2 0 1.7 roof, numbered and dated in liquid paper 2 1 1.2 1.6 0.1 3 0.2 0.4 0.4 1.2 4 0.4 0.4 1.5 0.2 on floor between climbs 5 0.4 0.4 1.4 1.3 6 0.5 0.3 2.1 0.4 7 3.2 0 - 1.5 up given as p - I think this means pitch; station 7 is station 1 of DR and LP Survey 8 0.4 1 1.4 1.2 LH wall, descending hole in floor 9 0 1 1 1.2 descending hole in floor 10 0.3 0.3 2 1 descending hole in floor 11 0.5 0.5 0.5 2.6 descending hole in floor 12 0 0.9 2 2.5 wall 13 0 0.8 4 1 wall 14 0.5 0.2 6 1.5 mid-passage, head height 15 0.1 0.5 0 5.0 16 1.2 0.1 1 0.7 17 0.7 1.1 6 1.1 18 0 0.5 5 1.5 19 0.5 0 5 1.4 20 0.1 0.6 5 2 21 0.5 0 5 1.5 22 0.1 0.4 5 2.5 23 0.2 0.4 3 1.5 24 1.2 0 1 2.2 25 0 2 3 1.3 26 0.3 0.4 0 1.4 27 0.2 0.4 1.5 0.3 passage ends 28 0.6 0.0 5 1.5 right might be 0.6 rather than 0.0 29 0 0.4 2 2.9 *end LazloStrog2