*begin right_hand_route-3 *export 23x *title "Notts II - Gour Inlet - right hand route after window - continuing from right hand route second survey" *date 2018.09.16 *team Tippex Nathanael Dalton *team Distox Emma Heron *team Notes Becka Lawson *instrument Becka's Distox2 2 *calibrate tape 0 ; +ve if tape was too short, -ve if too long ;from to tape compass clino remarks 23x 1 1.33 076.5 -33 1 2 6.15 150 -79 2 3 2.63 337.5 +32 3 4 3.50 083 +04 3 5 13.66 146 -32 5 6 5.79 331 -85 6 7 0.80 083 -33 7 8 10.69 250 -85 8 9 4.23 005 -19 9 10 3.30 051 -44 10 11 1.97 073 -28 11 12 3.17 010 -21 12 13 4.07 315 +06 13 14 4.84 013 -01 14 15 4.01 081 -08 15 16 2.52 073 -18 9 17 3.47 158 +17 17 18 9.93 076 +32 18 19 5.14 086 +52 ; CHECK 19 20 6.24 077 +36.5 ; CHECK 20 21 4.55 083 +66 21 22 1.81 058 +20 22 23 3.30 085 +72 9 24 5.80 294.5 +45 24 25 3.23 350 -11 25 26 3.99 283 -03 26 27 6.02 298 -29 27 28 7.83 325 +00.5 28 29 5.49 337 -12 *data passage station left right up down ignoreall 23x 1.5 0 5 1.5 rw darkness visible traverse - numbered from previous RH route 2 trip 1 1 2 2.9 5.5 LW by pitch bolts 2 1.8 0.7 1.7 8 RW bottom of rift 3 1.2 1.2 4 2 RW (same wall as 2) 4 1 1 1 0 end of mud choked passage 5 0 0.5 9 10 A metre below the bolts for Y hang of next pitch 6 0.5 0 10 10 opposite wall to deviation on RW 7 0 0.5 10 10 same wall as deviation 8 0 1.2 15 1 bottom of pitch 9 3 0 0.2 1.5 chamber, numbered (twice, both times badly) on corner 10 0.5 1 0.3 0.4 tube 11 0.5 0.3 0 0.2 roof of tube 12 1 0 0.3 0.1 RW at end of tube 13 0 2 1.2 1.2 far wall 14 1 2.5 2 1.7 LW before downstream sump 15 0.5 0.5 0 1.2 LW at start of downstream sump 16 0.4 0 0.2 0 start of downstream sump 17 1.5 0 1.6 0.2 RW mud ramp 18 0.3 2 3 0.5 base of climb 19 0.6 0.7 0 0.5 ceiling climb 20 6 1.5 4 1.7 top of slope, start of climb 21 1 0.2 0.7 0.7 RW up climb 22 0 0.4 2.5 0.3 LW 23 0.2 0.2 0.2 0.2 near end of wet drafting choke of boulders in wall and ceiling 24 0.5 1.3 1.7 1 LW 0.3m directly below Y hang bolts 25 1.2 0 2 0.5 RW before crawl 26 0 1.3 1.5 0.3 LW after crawl 27 1.1 0.3 1 1.4 RW 28 0 1.1 1.8 1.5 LW before upstream sump 29 0.6 0.1 0.1 0.2 above upstream sump on RW / ceiling *end right_hand_route-3