*begin MainStreamway2 *date 2006.10.16 ;Date: 16/10/2006 ;Cave: Notts II - MainStreamway ;Survey Kit RRCPC No ? ;Instruments: Richard Bendall ;Book: Neil Pacey ;Tape: Dave Ramsay ;Tape started at -10 centimetres (original notes - no Corrections) *Title "Mainstreamway - Green Tape to Kleine Scheldeg Chamber" *export 1 *export 12 ;commented out by Simon Cornhill 2019.04.27 as it is superseded by *declination auto in leckfell.svx ;*calibrate declination +3.35 ;RGB calculated mag decl from http://www.ngdc.noaa.gov/geomagmodels/struts/calcDeclination ;54.1994n 2.5124w 2006.10.16 *CALIBRATE tape -.10 ;Tape was 10 centimetres too long ;Station Tap Compass Clino L R U D 1 2 2.90 010 -1.5 ; 1 =tag at Green Tape Inlet 2 3 2.10 324 -13 ;1.5 0 6 1.3 3 4 5.06 344 -3 ;1.0 0 0.5 1.0 3=RHwall below dribbly flow stone 4 5 1.90 309 -8 ;1.0 0 6 1.8 5 6 5.10 246 -5 ;0.5 0 7 1.3 6 7 7.55 306 -2 ;0 1.3 8 1.3 7 8 3.20 272 -21 ;1.0 0.2 8 2.5 8 9 10.35 252 -9 ;0.1 0.8 9 1.6 9 10 1.85 - down ;0.1 1.1 9.5 1.9 Climb down into Kleine Scheldeg 10 11 5.65 309 -10 ;0.6 3.3 10 1.6 11 12 5.60 199 -22 ;3.2 0 11 1.8 *end MainStreamway2