*begin BTRoute *export tag 3 5 60 69 ; Cave: Notts *title "BT Route from yellow RRCPC tag in three ways chamber down to low point of duck" *date 2014.12.29 *team Insts and Notes Becka Lawson *team Rigger and Target Sam Allshorn *instrument Becka's Old Distox before it got calibrated the same evening *calibrate tape 0 ; +ve if tape was too short, -ve if too long *data normal from to tape compass clino ;from to tape compass clino remarks 1 tag 3.69 334 +17 1 2 2.91 089 +05 2 3 4.92 080 -01.5 3 4 4.18 052 -06 4 5 4.77 124 0 5 6 3.56 069 -05 ; 5 7 6.99 213 +08 ; removed as splay once surveyed the BTRoute2 6 8 0.77 158 -71 8 9 2.71 098 0 9 10 2.76 121 +02 10 11 2.06 032 0 11 12 1.13 273 -03 12 13 5.09 358.5 0 13 14 1.59 035 +01 14 15 3.14 348 +02 15 16 6.12 072 -07 16 17 3.95 293 -01 17 18 3.10 261 -05 18 19 1.42 297 -07 19 20 5.32 327 -02 20 21 2.85 298 -00.5 21 22 4.11 323 +08 22 23 2.82 052 0 23 24 4.05 062 -49 24 25 1.44 083 +57 25 26 0.78 030 +18 27 26 0.60 025 +44 27 28 2.25 117 -26 29 28 0.33 284 -45 29 30 13.06 089 -78 ; first pitch 30 31 7.31 293 -05 31 32 1.68 224 -08 32 33 3.67 305 -03 33 34 2.36 020 +04 34 35 5.59 232 +01 35 36 1.35 317 -05 36 37 1.76 021 +04 37 38 3.22 322 -02 38 39 5.78 188 +03 39 40 3.25 190 -02 40 41 1.92 230 +00.5 41 42 1.56 149 -05 42 43 1.78 239 -08 43 44 2.37 296 +02 44 45 1.85 215 +25 45 46 2.83 235 0 46 47 5.84 269 -11 47 48 17.25 077 +80 47 49 2.03 177 -64 49 50 2.31 239 -14 50 51 1.10 333 +22 51 52 2.97 208 +02 52 53 3.73 232 +09 53 54 2.06 214 -18 54 55 4.73 160 +03 56 55 0.76 105 +20 56 57 2.12 243 +16 58 57 3.01 021 +73 58 59 8.40 311 -78 60 59 2.82 309 -55 61 60 2.69 310 0 61 62 7.18 068 +64 59 63 4.71 305 -38 63 64 2.97 263 -29.5 64 65 13.80 170 -73 65 66 4.50 125 -21 66 67 6.59 153 -21 68 67 5.62 081 +05 68 69 2.23 279 -42 *data passage station left right up down ignoreall 2 1 0.5 0.5 0.1 edge of three ways chamber / start of BT route 3 0.5 1 0 0.3 r in inlet 4 0 0.8 0.3 0 l of crawl, up and down not sure, confusing 5 0.9 0 0.2 0.4 numbered 5 at junction, big inlet upstream 6 0.2 0.6 0.6 0.6 l wall ; 7 - - - - unmarked - removed 8 1 0.4 1.2 0 at stream level 9 0.1 0.3 0.8 0.2 cairn in stream 10 0.5 0.3 0.4 0.4 r wall 11 0.5 0 0.7 0.4 r wall 12 0 0.4 1.2 0.4 13 0 0.4 0.6 0.9 14 0.4 0.2 0.4 1 15 0 0.4 0.2 1.2 l wall 16 0 0.5 0.5 1.8 r wall where stream goes under 17 0 0.8 0.3 0.4 l wall, dry 18 0.3 0.6 0.7 0.4 l wall, dry 19 0.4 0 1.2 0.4 dry 20 0.4 0 1 0.7 21 0 0.4 0.8 1.2 l wall 22 0.6 0.6 0 2.6 23 0.5 0.5 0.2 3 24 0.3 0.3 3.2 0 25 0.4 0 1.6 1.7 near pitch, opposite drilled thread 26 0 0.5 2.5 2 first p-hanger 0.7m below a red Elliot bolt 27 0.5 0 2.5 2 opposite first p-hanger 28 3 4 4 12 bolt for final hang, guessed the down 29 - - - - 30 3 1 14 1 below the first pitch 31 0.3 0.4 0 0.6 passage after pitch 32 0 1.2 0.3 0.2 l wall 33 0.4 0.6 0.4 0.3 l corner 34 0.6 0 0.2 0.4 r wall 35 0.2 0.6 0.2 0.8 l wall 36 02. 0.6 0.5 0.6 l wall 37 0.5 0 0.3 1 r wall 38 0.6 0 0.1 0.9 r wall 39 0.2 0.6 1.8 0.1 l wall 40 0.1 0.3 0.3 1.8 l wall 41 0.6 0 0.4 1.8 r wall 42 0 0.4 0.4 1.8 l wall 43 0 0.3 0.7 1.6 l wall 44 0.4 0 0.4 1.6 l wall 45 0.2 0.2 0 2.5 ceiling 46 0.1 0.4 0 3.5 ceiling 47 1 0.6 10 3 past c2 down 48 - - - - up aven 49 0.2 1.5 10 1.5 l wall 50 0 0.6 6 1 l wall 51 1 0 4 1.6 r wall 52 0.3 0.3 2.5 1.5 mid passage 53 0.5 0.7 1.2 3 ceiling where drops 54 0.3 0 1 2.5 r wall at corner near 2nd pitch 55 0 0.7 0.7 9 1st bolt for 2nd pitch, 15cm to R of red Elliot bolt 56 0.3 0.1 1 10 r wall 57 0.3 0 0.2 11 pitch bolt on r wall 58 0 1.1 3.5 8 opposite deviation, half way down second pitch 59 0.5 0 10 1 base of pitch and top of 3rd pitch 60 0 1 10 3 numbered 60 at junction where major inlet comes in 61 2 0 6 2 r wall before waterfall 62 - - - - where waterfall comes from, unmarked 63 1 0 5 2.5 base of 3rd pitch, r wall 64 - - - - above 4th pitch 65 1 0 7 11 base of 4th pitch 66 0.6 0 15 0.5 r wall before waterfall 67 0 2 20 0.8 l wall after waterfall 68 0 1 1 2 l wall before duck 69 0.3 0.3 0 0.5 duck, at lowest point on ceiling *end BTRoute