*begin acrobat *export 1-0 1-32 1-10 ;;; TRIP COMMENT FROM POCKETTOPO ;;; ; ; beckas distox 0.39 calibration - recalibrated in the cave today *date 2012.10.28 *title "From bolt at top of iron ladder before Adamson's to part way down Acrobat Route in Notts" *team Instruments Andrew Atkinson *team Notes Becka Lawson with help from Andrew *team Tippex and Distox for last few legs Sally White *instrument Becka's distox calibrated in the cave on 28.10.12 with delta of 0.39 and Becka's PDA for notes *calibrate tape 0.00 ; +ve if tape was too short, -ve if too long ;commented out by Simon Cornhill 2019.04.27 as it is superseded by *declination auto in leckfell.svx ;*calibrate declination +2.36 ;RGB calculated mag decl from http://www.ngdc.noaa.gov/geomagmodels/struts/calcDeclination ;54.1994n 2.5124w 2012.10.28 *data normal from to tape compass clino ignoreall 1-1 1-0 0.410 135.49 -19.80 ext:0.0,0.1,0.2 1-1 1-2 4.573 252.28 -8.92 ext:0.0,0.2,0.2 ; 1.2 is hanger for pitch down 1-3 1-2 2.837 90.41 25.08 ext:0.0,0.1,0.4 1-3 1-4 5.236 143.33 69.01 ext:0.0,0.1,0.2 1-3 1-5 5.963 115.09 -83.53 ext:0.0,0.1,0.4 1-5 1-6 4.098 250.65 3.35 ext:0.0,0.1,0.1 ; stn 6 is 1st p hanger for next pitch 1-7 1-6 1.022 105.86 -2.87 ext:0.0,0.1,0.3 1-7 1-8 4.632 192.46 -58.69 ext:0.0,0.1,0.2 1-7 1-9 2.188 260.08 13.47 ext:0.0,0.0,0.1 1-9 1-10 1.399 155.53 3.68 ext:0.0,0.1,0.1 ; 1-10 1-11 9.293 118.23 -82.55 ext:0.0,0.0,1.1 ; superceded by Adamsons Route survey 1-12 1-10 1.371 118.56 7.70 ext:0.0,0.1,0.1 1-12 1-13 2.123 248.24 -10.97 ext:0.0,0.1,0.2 1-13 1-14 9.392 228.73 -79.69 ext:0.0,0.0,0.3 1-13 1-15 3.005 281.53 62.40 ext:0.0,0.0,0.1 1-15 1-16 3.492 262.07 3.19 ext:0.0,0.0,0.1 1-16 1-17 3.062 293.47 0.83 ext:0.0,0.1,0.1 1-18 1-17 2.640 015.68 10.71 ext:0.0,0.0,0.1 ;changed by RGB 30/10/12 compas was 735.86!! Checked on PDA by RL - compass there recorded as 10.7 so something wrong with Julian's conversion programme 1-18 1-19 7.253 238.88 78.97 ext:0.2,0.5,3.5 1-20 1-17 4.097 71.74 56.03 ext:0.0,0.4,0.2 1-20 1-21 3.379 310.03 -28.72 ext:0.0,0.1,0.1 1-21 1-22 9.066 45.25 -71.94 ext:0.0,0.1,0.1 1-21 1-23 3.428 280.43 -32.83 ext:0.0,0.1,0.1 1-23 1-24 2.660 278.89 -27.22 1-24 1-25 3.071 267.35 -5.00 ext:0.0,0.1,0.2 1-25 1-26 3.611 334.84 3.06 ext:0.0,0.1,0.2 1-26 1-27 1.962 323.44 8.38 ext:0.0,0.1,0.1 ; stn 27 numbered, 3rd p hanger, pitch head anchor 1-28 1-27 0.851 249.08 58.60 ext:0.0,0.2,0.6 1-28 1-29 5.526 254.30 8.50 ext:0.0,0.1,0.1 1-30 1-28 4.686 138.09 59.11 ext:0.0,0.0,0.1 1-30 1-31 6.935 42.75 47.69 ext:0.0,0.1,0.0 1-30 1-32 14.624 125.25 -78.23 ext:0.0,0.1,0.4 ; splays ;1-0 - 0.854 77.33 -16.22 ; 3 legs to check calibration ;1-0 - 0.853 256.36 16.22 ; p hanger at top of ladder, old stn from previous survey ;1-2 - 7.081 255.24 0.77 ; p hanger for pitch down ;1-3 - 1.305 117.69 10.05 ; numbered 3 opposite p hanger and lower than p hanger ;1-10 - 0.645 98.28 1.33 ; stn 10 is lower of 2 p hangers ;1-17 - 2.521 170.32 -16.09 ; 17 is ring hanger and numbered ;1-18 - 0.932 122.28 43.73 ; temp cairn ;1-20 - 0.992 192.55 -77.40 ; down small pitch *end acrobat