;Cave: Pipikin Pot - Gour Hall ;Surveyors: R.Duffy(notes)/S.Lieberman(instr)/T.Speight(spotter) ;Date: 11/05/13 ;Instruments: kit PAG + new disto ;*equate pip18d.005 pip18b.001 ; moved to parent file ;*equate Pip18d.002 Pip18.006 ; moved to parent file *begin pip18d *export 002 *export 005 *calibrate compass +6.50 *calibrate clino +0.50 *calibrate tape 0.00 *flags duplicate 002 001 03.38 070.5 -01.0 ;st001 is stal on ledge 013 001 20.17 173.0 +01.0 *flags not duplicate *flags splay 002 003 09.44 143.0 -22.0 ;st002 is wall above left mud bank 002 004 19.15 162.0 -23.0 002 006 13.06 188.5 -17.0 002 007 13.43 218.0 -08.0 002 008 15.48 223.0 -02.0 002 009 14.70 240.5 +08.0 002 010 10.77 247.0 +05.0 002 011 16.03 316.0 +18.0 002 012 15.39 335.0 +13.0 *flags not splay 013 015 09.98 329.0 +17.0 ;13-15-15a distinct passage leading off chamber 015 015a 09.98 335.0 +55.0 002 005 17.99 173.0 -21.5 ;Survey pip18b is duplicate so this leg connects extremeways *flags splay 013 014 07.75 116.0 +07.0 013 016 13.17 000.0 00.0 013 017 09.29 040.0 -24.0 *flags not splay *end pip18d ;st l r u d comments ;1 0/5 13/8 2/0 1/6 stal on left ledge ;2 3/3 10/2 8/9 1/6 head height below aven ;3 wall above mudbank ;4 0/5drop ch 3/0 0/5 hole into Earby dig ;5 1/0 ch 2/5 0/7 Extreme Ways entrance ;6 slope 0/6 ;7 5/0 1/2 ;8 3/0 0/6 rt side of small alcove 1.5m into ;9 small stal at top of slope 1.5m into and up ;10 2/7h0/5l 1/7 ;11 highest point in chambers edge ;12 0 0/5 ;13 6/5 5/8 1/9h1/1l 1/4 heading outward ;14 ;15 ;16 ;17 3/0 2/0 1/2 1/6