;Cave: Pipikin- Gour Hall to tag near Hall of the Ten (Pip15) ;Surveyors: H.St.Lawrence/Ian Lawton ;Date: 07/03/99 ;Instruments: PAG ;*equate pip18.028 pip15.040 ;;;*equate Pip18.006a Pip24.016 ;6a not correct point - superceded by link by pip18b ;*equate pip18.011 pip18a.005 ;joins Electric Wine Gum *begin pip18 *export 006 *export 011 *export 028 *calibrate compass +4.50 *calibrate clino 0.00 *calibrate tape 0.00 ;*fix 001 001 001a 04.20 149.0 -03.0 001a 001aa 04.00 140.0 00.0 ;estimated values very tight(bang!) 001 001b 03.00 053.0 -59.0 001b 001c 05.00 - DOWN ;estimated drop pitch 001 002 05.50 004.5 -18.0 ;squeeze 002 003 04.50 003.0 -50.0 003 004 02.70 358.5 -30.0 004 005 08.30 360.0 +29.0 ;6m aven in Gour Hall 005 006 15.20 330.0 +15.0 ;st006 below +12m aven *flags splay 006 006a 15.00 225.0 00.0 *flags not splay 006 007 20.90 012.0 -01.5 007 008 08.00 039.0 -26.5 008 009 22.40 040.0 -16.0 009 010 08.90 039.5 00.0 010 010a 06.20 130.0 -02.0 ;bedding crawls in sand left & right 010 011 24.50 033.5 +01.0 ;st011 is inlet aven +12m 011 012 11.30 006.0 +04.0 012 013 09.70 062.5 -06.0 013 014 06.90 058.5 -17.0 014 015 04.90 041.0 -09.0 015 016 07.50 031.0 -03.0 016 017 23.60 058.0 00.0 ;13m from st016 is wide bedding on right 017 018 09.30 023.0 +03.0 ;-2m drop at st018 into Cross Hall ;Surveyors: R.Duffy/S.Lieberman ;Date: 06/02/08 ;Instruments: MKO (Mendip Karate Otter) *calibrate compass 0.00 *calibrate clino 0.00 *calibrate tape 0.00 018ai 018aii 12.00 140.00 00.0 ;end of dig on 21/03/08 018a 018ai 24.00 - DOWN ;down through boulders not straight data S.Wilson Earby 018a 018 11.83 178.0 +19.0 ;st018a is top of boulder at top of Earby dig 018a 018b 07.93 091.0 +35.0 ;st018b to 018e are sts in chamber 018a 018c 11.79 140.0 +11.0 018a 018d 06.97 181.0 +10.0 018a 018e 10.76 300.0 +33.0 018e 018f 08.36 018.0 +14.0 ;st018f is alcove on sandy ledge ;aven in middle of chamber is 16m high and 5.4m from st018c ;Surveyors: H.St.Lawrence/Ian Lawton ;Date: 07/03/99 ;Instruments: PAG *calibrate compass +4.50 *calibrate clino 0.00 *calibrate tape 0.00 018 019 16.80 019.0 +06.0 ;other side of Cross Hall 019 020 15.00 349.5 +02.0 ;hole down on left of st020 -0.7m? 020 021 19.90 083.0 +04.0 ;stals 021 022 08.70 135.5 -07.0 022 023 02.50 118.0 -07.0 023 024 03.80 129.0 -01.0 024 025 06.20 154.0 +08.0 025 026 15.90 088.0 +03.0 ;on left of st026 is drop and crawl passage(needs survey!!) 026 027 16.60 112.5 +12.0 027 028 00.40 - UP ;st028=tag Pip15.040 *end pip18