*begin RiftPotEntrance *export 208 212 213 220 246 *title "Rift Pot Entrance" *date 2009.11.28 *team Instruments Becka Lawson *team Notes Patrick Warren *instrument tape Neil's distox ; double-checked *calibrate tape 0 ; +ve if tape was too short, -ve if too long ;from to tape compass clino remarks 208 209 19.85 003 +12 ; 209 208 19.83 182 -14 conventional instruments 209 210 17.91 115 -13 ; 210 209 18.11 296 +3 conventional instruments 210 211 6.86 142 +15 ; 211 210 6.83 321 -17 conventional instruments 211 212 13.14 087 +31 ; 212 211 13.20 265 -33 conventional instruments 211 213 14.52 165 -21 ; 213 211 14.51 340 +20 conventional instruments 213 214 6.65 268 +7.5 ; 214 213 6.66 089 -8 conventional instruments 215 214 21.09 263 -85 ; written as 214 to 215 in notes but Patrick did a backsight 215 216 0.25 - up 217 215 2.95 316 -23.5 218 217 6.55 243 -89 219 218 6.57 291 -53 220 219 6.60 273 -74 221 220 1.40 283 -22 221 222 2.78 046 +29 222 223 2.87 052 +51 223 224 0.89 085 +14 224 225 2.11 039 +46 225 226 2.22 359 +50 226 227 2.49 020 +10 227 228 0.94 080 -10 228 229 2.97 015 +5 229 230 2.47 091 +21 230 231 2.08 004 -6 231 232 4.37 270 +73 232 233 3.71 083 -13 232 234 5.76 248 +4 234 235 2.57 239 0 235 236 2.93 278 0 236 237 6.08 206 +2 237 238 5.13 204 +2 238 239 3.23 125 +3 239 240 4.19 135 +2 240 241 3.59 142 +84 241 242 5.24 139 +61 242 243 1.10 137 +56 243 244 4.72 137 +80 244 245 5.80 140 +48 245 246 2.45 297 +63 *data passage station left right up down ignoreall 208 22.6 8.5 5.4 0.5 209 3.5 4.8 3.0 1.8 210 0 17.7 7.9 1 211 1.3 5.8 5.8 0.8 212 - - - - 213 0 20 3.3 1.6 nsew 214 - - - - 215 2 4.5 1.8 0 216 - - - - bolts for main hang on dry route 217 2 4.5 1.8 0 218 3.3 3.7 0.7 0 219 - - - - 220 0.5 0 0.5 6.6 221 0.5 0 1.8 0.8 222 0 0.8 2.4 1 223 0 0.3 2.3 1.8 224 0.5 0 2.3 0.4 225 0 0.4 1.8 1 226 0.3 0 0.5 0.5 227 0 0.5 0 0.4 228 0.2 0.4 0.3 0.1 229 0 0.6 0.5 0.1 230 0.4 0 0.4 0.6 231 0.4 0 4.4 0.3 232 0.8 0.4 0 2.0 233 - - - - 234 0.8 0.2 0 0.4 235 0 0.5 0.1 0.3 236 1 0.3 0.2 0.2 237 1 0.2 0.1 0.2 238 1.2 0.4 0.1 0.2 239 - - - - lruds missing for one station between 235 and 242; I have guessed it is 239 because later station up/downs seem correct and LR seem OK for earlier stations 240 0.5 0.6 0.5 0.2 241 1 0.8 3 0.1 on floor after crawl, just before entrance pitch 242 1.2 0.1 11 3.6 on wall behind scaff bars after initial climb before start main entrance pitch 243 0.3 0.3 5 2 just above hole before entrance pitch 244 0.5 0 4 4 in canyon 245 0 1.5 1.5 3 on l wall where climb out of entrance 246 - - - - rrcpc cow tag above rift entrance *end RiftPotEntrance