*begin RumblingMain *export 1, 45 *title "Rumbling Main Route" *date 2010.11.07 *team Notes Becka Lawson *team Instruments Julian Todd ;Rigging Martin Green *instrument Becka's Tandem as comp and clino and Becka's 30m tape read from 0cm *EQUATE 3 entrance *ENTRANCE entrance *calibrate tape 0.20 ; +ve if tape was too short, -ve if too long ;from to tape compass clino remarks *flags surface 2 1 5.85 206 +31 2 3 7.88 055 -59 *flags not surface 3 4 25.17 - down 5 4 3.52 060 -65 5 6 9.72 281 +07 7 4 1.36 292 -19 7 8 15.20 078 -54 8 9 12.83 095 -32 9 10 8.58 078 -13 10 11 3.25 105 -17 11 12 9.56 095 -11 12 13 3.01 078 -03 13 14 5.03 102 -09 14 15 4.74 088 -02 15 16 4.62 092 -10 16 17 7.62 091 -11 17 18 8.24 096 -10 18 19 8.55 088 -12 19 20 7.30 092 -15 20 21 3.46 139 -06 21 22 4.90 124 -10 22 23 4.20 135 -38 23 24 1.62 188 -73 24 25 0.91 145 +57 24 26 2.84 142 -19 26 27 5.23 - down 27 28 3.23 133 -16 28 29 10.06 - down 30 29 4.58 302 -31 31 30 6.42 313 +34 31 32 0.98 033 +55 31 33 7.19 131 -23 33 34 2.42 113 +30 31 35 11.75 - down 36 35 2.64 324 -35 36 37 6.00 215 -63 37 38 2.83 271 +05 38 39 4.50 270 -45 39 40 5.31 082 -02 40 41 1.48 106 -06 41 42 5.09 075 -16 42 43 2.20 145 -19 43 44 0.79 012 +15 45 46 4.54 000 -03 47 46 2.72 098 -01 46 48 5.47 123 -16 48 49 2.82 222 -19 50 49 1.73 308 -06 51 52 3.62 177 -10 51 50 0.51 085 +20 53 52 1.76 250 0 54 45 14.95 080 -75 43 54 3.21 085 +04 *data passage station left right up down ignoreall 1 - - - - top of stile 2 - - - - r side of tree 3 0.5 2 2 25 knobble just above main pitch y hang of phangers 4 0.5 0.5 30 0 plumb to floor inbetween 1st and 2nd phangers of traverse 5 1.5 0 28 1.5 first (uppermost) phanger on ledge 6 0.2 1.2 26 1.9 back of ledge, numbered 7 1.1 0 30 1 old spit r wall just below second phanger 8 0 3 40 1.7 l wall bottom of 2nd pitch by waterfall 9 1 0 5 1.7 r wall below cascades 10 0 1.2 6 1 l wall by dam 11 0.3 0.1 1.3 1.2 r wall 12 0.5 0.2 2.5 1.8 r wall 13 0 0.5 1.4 1.5 l wall 14 0.4 0 2 1.3 r wall 15 0 0.4 2 1.3 l wall 16 0.6 0.1 2 1.3 r wall before aven and inlet 17 0 0.5 2 0.8 l wall past aven with inlet 18 0.3 0.1 3.5 0.8 r wall 19 0.4 0 3.5 1.5 r wall 20 0 2.5 4 1 l wall end of widening 21 0.3 0.3 1.5 1.2 r wall 22 0 0.3 1.5 4 l wall 23 0.4 2 3.5 6 rock pillar 24 1.7 1.5 5 1.1 l side of 2nd rock pillar 25 1.7 0.5 4 1.6 backup phanger with red behind phanger 26 0.3 0.1 1 10 knot of y hang 27 0 0.5 7 6 l wall 28 1.5 0 10 15 r wall p hanger for main pitch 29 1.8 0.2 20 0 floor ledge 30 0 0.6 20 6 p hanger on l wall 31 0.5 1 10 12 knot of y hang of next pitch 32 - - - - left wall p hanger for ?third? pitch by ladder in ceiling 33 1.3 1.2 3 1 dry chamber 34 1 0.7 0.2 10 stal, looks like trench in floor opens onto next pitch 35 1.5 1.5 15 0.3 by pool 36 0 1 0 7 backup p hanger 37 0 0.4 1.5 0.5 l wall past pool 38 0.5 0 0.5 4 p hanger for pitch 39 1.4 0.3 2.5 0 base of large stalagmite below stalagtite 40 0 0.5 1 0.6 l wall 41 0 0.5 0.7 1 l wall 42 0 0.4 1.5 1 l wall 43 0.5 0 2 1.2 r wall opposite backup p hanger 44 0 0.5 2 1.2 backup p hanger 45 3 0 15 1.7 base of last pitch 46 0 1 2 1.9 l wall 47 0 0.6 1 1.8 l wall up inlet, numbered high on left 48 0 1.5 6 1.1 l wall 49 0.4 0 5 0.4 r wall 50 0.1 0.4 0.5 0.9 l wall at corner 51 0.5 0.1 0.5 0.6 r wall 52 0.4 0 1.1 0.3 r wall at start of sump pool 53 0 1.2 1 0.3 l side of sump pool, next to where dive line is tied off, sump goes off inbetween stns 52 and 53, 53 is numbered# 54 0.3 0.3 0.3 15 top of pitch, about 0.8m beyond the main pitch p hanger, at same height as p hanger *end RumblingMain