;Cave: Witches II ;Surveyors: Dave Ramsay/Richard Bendall ;Date: 01/11/10 ;Instruments: Red Rose Suunto Compass & Clino kit 2, 30m tape *begin WitchesII-3 *export 003 013 014 018 019 020 021 022 028 *date 2010.11.01 ;commented out by Simon Cornhill 2019.04.27 as it is superseded by *declination auto in leckfell.svx ;*calibrate declination 2.65 ;*calibrate compass ;stn to stn tape comp clino 001 002 6.00 330 +25 002 003 5.96 014 +14.5 004 002 7.66 345 -47 005 004 3.24 262 -63 006 005 3.30 337 -72 007 006 3.00 170 -52 ;tape guessed due to vdlb 009 008 5.18 173 -17 010 009 3.67 137 +8 010 011 3.00 335 0 010 012 8.22 180 +54 013 012 3.08 008 +17 014 012 6.27 130 +10 015 016 2.45 343 +23 016 017 4.68 - UP 017 018 8.92 350 +37 018 019 3.05 039 -30 020 021 6.45 311 -37 021 022 10.54 020 -11 023 022 9.41 317 +0.5 024 023 16.19 337 0 022 025 8.37 248 +22 025 026 23.37 329 +34 026 027 9.87 019 +13 027 028 6.28 330 -15 028 029 13.13 356 +2 029 030 11.91 329 -4 *data passage station left right up down ignoreall 001 0.5 0.0 0.6 1.3 ;end of passage at "smile" dig 002 0.0 1.7 10.0 1.5 ;on wall at head height 003 3.0 0.0 6.0 5.0 ;Stn001 from Shuttleworth 1 004 0.8 0.0 4.0 6.0 ;on RH wall up rift 005 0.3 1.1 2.0 1.2 ;L wall 006 1.8 0.0 1.5 1.4 ;R wall 007 2.0 1.0 1.7 1.4 ;no way on between big cantilevered rocks 008 0.4 0.0 1.0 1.0 ;End of Mud "sump" 009 1.0 1.5 0.0 0.5 ;stall on roof of mud "sump" at high point 010 0.1 2.4 0.8 1.1 ;foot of climb down, head height 011 0.5 0.5 0.5 0.5 ;other edge of mud "sump 012 1.8 4.5 4.0 0.4 ;rim of crater in main passage 013 0.1 3.5 5.0 1.3 ;is stn021 from Shuttleworth 1 014 1.7 2.0 5.0 0.4 ;is stn022 from Shuttleworth 1 015 0.2 0.4 0.4 0.0 ;stream flows through fist sized hole 016 0.0 0.4 4.5 0.8 ;bottom of chimney climb 017 0.0 0.4 0.2 5.2 ;top of chimney 018 0.0 2.2 5.0 1.4 ;LH wall 019 1.5 2.2 3.4 0.1 ;stn024 from shuttleworth 1 020 0.0 4.5 15.0 2.4 ;on bolt, stn019 from Shuttleworth 2 021 6.0 7.0 4.0 1.8 022 4.5 3.0 0.3 1.3 ;roof spike above true R of Cascade 023 3.0 4.0 0.1 0.8 ;roof of passage 024 3.0 1.5 0.6 0.5 ;sump pool? estimated 7m further to sump 025 0.1 2.7 15.0 1.6 ;LH wall 026 1.5 5.0 4.5 1.1 ;on shelf LH side 027 5.5 0.0 6.0 1.6 ;just past small aven inlet 028 2.8 2.4 6.0 0.3 ;boulder in mid passage, routes off L and R 029 6.0 0.0 7.0 1.4 ;RH wall below inlet 030 1.0 1.8 0.0 0.9 ;end of passage at roof, continues low for 2m *end WitchesII-3