;Re-organised 13.07.2015 by Noel Snape ;Data source not currently known (not recorded in current files) *begin UpstreamSump *date 2015.07.13 ;date added by Simon Cornhill to make the survey compile ;<<>> *export 5 *calibrate declination 0 ;this is to stop declination being added twice *calibrate compass +182.68 *data diving from to bearing length fromdepth todepth 5 5a 160 5.45 0 -0.5; (5) is P-Bolt at the start of the first upstream Rowten sump. (4) & (5) were not connected as these require dry survey techniques. 5a 6 160 5.45 -0.5 0; 6 6a 150 11.30 0 -1.0; 6a 7 150 11.30 -1.0 0; (7) is a bolt with diveline belayed to it in an airbell - approx 3m high, 3m wide 7 7a 190 5.25 0 -1.0; 7a 8 190 5.25 -1.0 0; (8) is another airbell 8 8a 140 24.35 0 -1.9; 8a 9 140 24.35 -1.9 0; (9) is the tie in point at the end of this survey leg. It ends in low, wet canal (Frakes passage) along the line (not at a belay) and is indicated by a white line arrow, placed on the dive line on the right hand side of the passage (heading upstream) and is a marker to tie into. *end UpstreamSump