;original data *data normal from to length bearing gradient *begin landlord *export ent *fix ent 90271 78657 340 ;stn ent (was 14) is top of scaffold poles at entrance; ;stn 22 is start of upstream survey; ;stn 12 is approx centre of passage at bottom ;of entrance slope down and has been equated to ;your stn 1; ;stn 1 is centre of passage at beginning ;of final chamber before lower passage ;dug out to sump 1 1a 2.2 111 0 2 1 3.8 153 0 3 2 4.1 80 -25 3 4 5.65 200 9 4 5 4.3 151.5 2 5 6 5.5 202 1.5 6 7 2.4 261 9 7 8 2.6 231 5 8 9 2.6 295 7.5 9 10 2.5 184 1 10 11 1.4 250 12 11 12 3.7 337 4 12 22 3.65 273 0 22 23 2.6 300 0 23 24 3.8 270 0 24 25 1.5 210 0 25 25a 6.0 280 0 25 25b 3.0 190 0 12 13 2.6 33 16 13 ent 4.25 0 90 *end landlord